8.1
General notes
➤
We recommend having the machine checked and inspected once a year by an expert
(
- customer services).
➤
Check level of release agent before every operation and top up if necessary (see
diagram).
8.2
Maintenance schedule
The values listed are only guide values. The periods can change regarding aggres-
siveness of the material being used or environments conditions.
1 - 2 days period:
➤
Clean suction filters (refer to chapter 8.2.2) and high pressure filters (refer to chapter
8.2.1) before start to work in the morning.
Weekly period:
➤
Check pneumatic oiler of DUOMIX (approx. one drop at every 12 double strokes).
➤
Check release agent fluid in the material pumps.
➤
Circulate the DUOMIX for half an hour after 2 days, if the pump is not in use, to pre-
vent clogging after sedimentation of Base.
➤
Clean the static mixer.
Monthly period:
➤
Clean mixing blocks.
➤
Clean manifolds.
➤
Clean check valves.
➤
Clean connection hoses (from mixing block to manifold).
1 Year period:
➤
Replace Base high pressure - hose and return hose.
➤
Replace the spray hoses.