FURNACE – UNLOADING & MOVING
Continued:
Method 2: Lifting the furnace from the top
Spreader Bar:
The WinterGreen furnace comes with 2 (two) lifting eyelets located on opposing top corners of the unit.
One method of lifting the unit can be the use of a spreader bar. The spreader bar can have either lifting
slings or chains. Place the bar diagonally across the forks of the lift truck and attach the chains or lifting
slings so as they are directly in line with eye hooks.
(See figure 2) It is important that when the unit is
lifted there s no side pull on the eyelets as this will cause damage to the unit and possible per-
sonal injury.
Slings:
To use just nylon lifting slings to lift the furnace, first slide one end of the sling through an eyelet until
both end sare of equal length. Do the same with the other eyelet. Both slings should be equal in length.
Adjust both forks on the lift truck so the center of each fork is directly centered to each eyelet. Slide each
sling over a separate fork. One sling will be to the back of one fork and the other sling will be to front of
opposite fork.
Slowly
lift the forks until there is tension. Check to see if there is any side pull on the eye-
lets. Several re-adjustments may have to be made before the sling position is correct.
(See figure 3) Be
sure not to lift if there is any side pull, damage to the furnace will occur.
Continued on next page…
Содержание IM-130
Страница 8: ...WARNINGS SAFETY SAFETY LABEL LOCATIONS...
Страница 16: ...FURNACE COMPONENT LIST...
Страница 35: ...WOOD SELECTION CHART The Weights and Measure Act states that a cord of wood is 4 ft x 8 ft x 4ft 128 cu ft...
Страница 54: ...PLUMBING INSTALLATION...
Страница 57: ...WIRING CONTROLS Control Panel Components Figure 2 Control Panel FUSE...
Страница 65: ...TROUBLESHOOTING GUIDE...