2
OPM-117/B
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
3
TESTING POLICY
3
SAFETY INFORMATION
4
CALIFORNIA PROPOSITION 65
ANSI SAFETY DEFINITIONS
SPECIFICATIONS 5
PSS60/E
PSS90/E
INTRODUCTION 6
PRODUCT DESCRIPTION
PREPARING THE UNIT
6
START-UP CHECK LIST
UNPACKING
INSTALLATION 7
ENGINE-GENERATOR SET MOUNTING
FUEL INSTALLATION
7
INSTALLING THE FUEL LINE
LIQUID PROPANE VAPOR (LP)
NATURAL GAS (NG)
FUEL PRESSURE
FUEL PRESSURE TABLES
NG/LP FUEL CONVERSION
INSTALLING THE BATTERY
9
SERVICING BATTERIES
BATTERY CHARGING
CONNECTING THE BATTERY CHARGER & BLOCK HEATER
AC ELECTRICAL CONNECTIONS
11
DC ELECTRICAL INTERCONNECTION 12
GROUNDING
MOUNTING THE AUTOMATIC TRANSFER SWITCH
ASCO 185 UL SWITCH
ASCO 300 UL SWITCH
STARTING PROCEDURE
13
INITIAL START UP
VOLTAGE REGULATOR WIRING
15
PREVENTATIVE MAINTENANCE
15
AUTOMATIC TRANSFER SWITCH
ENGINE-GENERATOR SET
COLD WEATHER OPERATION
MAINTENANCE SCHEDULE
16
TROUBLESHOOTING TABLES
16
AC WIRING
17
ENGINE HARNESS SCHEMATIC
18
DSE 7310 MKII WIRING DIAGRAM
19
LIMITED WARRANTY
20