The engine manufacturer has established an excellent
worldwide engine service organization; engine service is
available from a nearby authorized dealer or distributor.
The rated power of each engine-generator is limited by
the temperature, altitude, and all other ambient conditions
specified by the engine manufacturer.
Derates
Above Sea Level
3% PER 1,000 Feet
Ambient Temperature
>104°F
3% per 10°F
Units should not be operated in ambient temperature
greater than 125° Fahrenheit.
GENERATOR:
The nameplate includes a standby rating. The standby
rating is the maximum amount of power the generator set
can produce.
WINCO generator sets use a brushless, AVR (Auto-Voltage
Regulator) controlled broad-range generator ends. The
generator converts rotational mechanical energy into
electrical energy. These WINCO units are equipped
with generators manufactured by Cummins Generator
Technologies. Each generator ‘end’ has its own data tag. A
unique serial number is on the data plate and the data label
is affixed to the main frame on the generator on the left
side.
PREPARING THE UNIT
START-UP CHECK LIST
A Start-Up Completion & Warranty Validation Form was
sent along with this manual. This must be completed and
returned to WINCO Inc. within 180 days of the factory
invoice date. If this form is not returned, the Warranty may
be voided.
UNPACKING
1. As you receive your unit, it is critical to check it for any
damage. If any damage is noted, it is always easiest to
refuse the shipment and let WINCO take care of the
freight claim. If you sign for the unit, the transfer of the
ownership requires that you file the freight claim
2. Before proceeding with the preparations of your new
generator for operation, take a couple of minutes to
ensure the unit you have received is the correct model
and review the specification pages in this manual to
ensure that this unit meets your job requirements.
CAUTION: EQUIPMENT DAMAGE:
This unit is shipped with oil and a 50/50 mix of coolant. Be
sure to check all fluid levels before operating. See engine
manufacturer’s instruction manual for recommended oil
requirements before initial starting.
Once generator set is on-site:
1. Carefully remove the crate.
2. After inspecting the engine-generator for external,
physical damage, locate and check the following items
packed with the unit:
a. Installation and Operator’s Manual.
b. Engine manufacturer’s instruction manual.
c. Battery hold-down brackets & hardware.
d. Unit components or accessory items shipped loose
for on-site installation.
e. Optional accessories.
3. Remove main frame hold-down bolts.
4. Unit can now be lifted from shipping rails.
LIFTING THE GENERATOR SET
NOTICE: PERSONAL INJURY:
To prevent injury to persons or equipment, observe the
following guidelines when lifting the generator:
Due to the different designs, configurations, options,
weights, site conditions, and available material handling
equipment, specific lifting instructions are not provided for
each individual generator set model. General guidelines
provided are applicable to the entire generator line. It
is the responsibility of the installing party to follow the
lifting equipment’s operator’s manual to prevent injury to
personnel and damage to the generator.
Smaller generator sets may not require use of overhead
lifting equipment and may be placed on the pad with basic
material handling equipment, i.e. a forklift. Always use
forklifts of a proper rating and with long enough forks to
move the generator. As the distance from the forklift mast
increases the lifting capacity for the forklift decreases. When