Chapter 2
Installation
2-1
INTRODUCTION
This chapter provides installation instructions for the Series 681XXB
Synthesized Sweep Generator. It includes information on initial inspec-
tion, preparation for use, storage, and reshipment, and General Pur-
pose Interface Bus (GPIB) setup and interconnections.
2-2
INITIAL INSPECTION
Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, retain until the contents of the ship-
ment have been checked against the packing list and the sweep gener-
ator has been checked for mechanical and electrical operation.
If the shipment is incomplete or if the sweep generator is damaged me-
chanically or electrically, notify your local sales representative or
WIL-
TRON
Customer Service. If either the shipping container is damaged
or the cushioning material shows signs of stress, notify the carrier as
well as
WILTRON
. Keep the shipping materials for the carrier’s inspec-
tion.
Use two or more people to lift and move this equipment, or
use an equipment cart. There is a risk of back injury, if this
equipment is lifted by one person.
WARNING
681XXB OM
2-3
Changed: November 1995