48
WILO SE 06-2015 V05 DIN A4
English INSTALLATION
5.
Place the cover flange centrally on the load distribution plate or on
the last concrete ring.
6.
Align the traffic surface including substructure with the pump cover.
5.2.8. Installing the pump
Observe the installation and operating instructions for the pump.
CAUTION!
Stud bolts not removed from the hydraulics (Drain MTS, Rexa
CUT)can lead to malfunctions and damage to the pump chamber
wall.
Some parts of the fluid can accumulate on the stud bolts,
impairing free access to the intake area and macerator in the
pump.
The intake area and macerator in the pump must be kept free of
deposits.
Fig. 10: Preparing the pump
1 Pump
3 Attachment for chain
2 Discharge pipe
4
Cable tie
• Remove coarse contaminants in the pump chamber.
• Screw together the pump and discharge pipe outside the pump
chamber using the assembly materials supplied.
• Attach the connection cable to the horizontal section of the dis-
charge pipe using the cable tie supplied. The cable should run from
the pump to the cable tie with slight tension and with no slack.
• Close the shut-off device
• Suspend the chain from the discharge pipe (observing the separate
installation and operating instructions for the chain) and lower the
pump and discharge pipe into the pump chamber until the two cou-
plings have completely engaged with one another.
When lowering the pump, guide it in such a way that it does not
remain suspended on the pump chamber fittings.
NOTE:
For problem-free installation of the pump, it must be twisted later
-
ally by around 90° so that it can be guided past the cross member.
• After suspending the pump, check that it is suspended freely and
with sufficient clearance from the pump chamber wall and that it
cannot touch the pump chamber wall.
• Detach the chain from the lifting equipment and suspend it from the
chain hooks in the pump chamber.
CAUTION!
Improper handling of the pump can lead to damage. Only sus-
pend the pump from the installed discharge pipe with a chain,
never from the connection cable.
5.2.9. Installing the level control device
Observe the installation and operating instructions for the level
control device.
RISK of explosive atmosphere!
If the operator has declared the operating space as an Ex zone,
the signal transmitters must be connected using an intrinsically
safe electric circuit.
Consult your electrician for further details.
1
2
4
3
Fig. 10