English INTRODUCTION

1.  Introduction

1.1.  About this document

The language of the original operating instructions is German. 

All other languages of these instructions are translations of the 

original operating instructions.

This manual is divided into individual sections, which are listed in the 

table of contents. Each section has a heading which clearly describes 

its content.

A copy of the EC declaration of conformity is a component of these 

operating instructions.

If a technical modification is made on the designs named there with

-

out our agreement, this declaration loses its validity.

1.2. 

Personnel qualifications

All personnel who work on or with the pump chamber must be quali-

fied to carry out this work, e.g. electrical work must be performed by 

a qualified electrician. All personnel must be of legal age.

Operating and maintenance personnel must also observe national 

accident prevention regulations.

It must be ensured that personnel have read and understood the in-

structions in this operating and maintenance handbook; if necessary, 

this manual must be ordered from the manufacturer in the required 

language.

This pump chamber is not designed to be used by persons (including 

children) with restricted physical, sensory or mental capacities, or 

those with a lack of experience and/or knowledge, unless they are 

supervised by a person responsible for their safety and have received 

instructions from that person on how the pump chamber is to be 

used.

Children must be supervised to ensure that they do not play with or 

in the pump chamber.

1.3.  Copyright

This operating and maintenance manual has been copyrighted by 

the manufacturer. The operating and maintenance manual is intend

-

ed for use by installation, operating and maintenance personnel. It 

contains specifications and drawings of a technical nature, which 

- either in whole or in part - may not be duplicated, disseminated, 

utilised without authorisation for the purposes of competition or 

distributed to third parties. The illustrations used may differ from 

the original and are intended merely as an example representation of 

the chamber.

1.4.  Subject to change

The manufacturer reserves the right to make technical modifications 

to systems or components. This operating and maintenance manual 

relates to the pump chamber specified on the title page.

1.5.  Warranty

In terms of the warranty, the current version of the "General Terms 

and Condition of Business" is applicable. You can find these here:

 

www.wilo.com/legal

Any deviations must be contractually agreed and shall then be given 

priority.

1.5.1.  General

The manufacturer has an obligation to resolve any defects on cham-

bers sold if one or more of the following apply:

• The defects are caused by the materials used or the way the product 

was manufactured or designed.

• The defects were reported in writing to the manufacturer within the 

agreed warranty period.

Содержание Wilo-Port 800

Страница 1: ...de instalaci n y funcionamiento no Monterings og driftsveiledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje hr Upute za ugradnju i uporabu sr Uputstvo za ugradnju i upotrebu sl Navod...

Страница 2: ...ntended use and fields of application 36 3 2 Improper use and fields of application 36 3 3 Set up 37 3 4 Function description 37 3 5 Materials 38 3 6 Technical data 38 3 7 Type key 38 3 8 Dimensions 3...

Страница 3: ...supervised by a person responsible for their safety and have received instructions from that person on how the pump chamber is to be used Children must be supervised to ensure that they do not play wi...

Страница 4: ...ng apply Inadequate configuration by the manufacturer due to the infor mation provided by the operator or customer being insufficient or incorrect Non compliance with safety instructions and working i...

Страница 5: ...hen installing and removing the pump chamber A second person must always be present Adequate ventilation must be ensured when working inside the pump chamber All work assembly dismantling maintenance...

Страница 6: ...ump and how to shut it off For the connection refer to the operating and maintenance manual for the pump installed The pump installed must always be earthed 2 4 Safety and monitoring equipment The pum...

Страница 7: ...quality assurance Fault free operation is guaranteed if it is installed and maintained correctly 3 1 Intended use and fields of application RISK of explosive atmosphere Sewage containing faeces can le...

Страница 8: ...ater in Germany in accordance with DIN 1986 3 3 3 Set up Fig 1 Overview 1 Pump chamber 9 Inlet connection 2 Discharge pipe 10 Venting cable ducts 3 Non return ball valve 11 Pump 4 Surface coupling 12...

Страница 9: ...0 Ventilation connection cable bushing 1x DN 100 Max permitted ambient temperature 20 C Ground below depth of 0 5 m Max permitted ground water level Ground level Impoundment volume See data sheet cata...

Страница 10: ...n materials for pumps Installation and operating instructions NOTE For use as a pumping station accessories are required that have to be ordered separately 3 10 Accessories Clamp bolting for connectio...

Страница 11: ...for storage Place the pump chamber securely on a solid bearing surface and secure it against falling over or sliding away Pump chambers are stored vertically DANGER due to falling over Never set down...

Страница 12: ...ing installa tion and suffer serious injuries During installation the installation location must be appropriately marked and secured Always close the installed pump chamber with an appropriate pump co...

Страница 13: ...0 mm Max height adjustment with plastic pump chamber extension 500 mm CAUTION The pump chamber may not be installed in peaty ground This can lead to destruction of the pump chamber Pump cover Must be...

Страница 14: ...engineering and road building slope angle installation If required due to the groundwater level the pit must be protected using a groundwater drawdown NOTE If a class D400 pump cover is to be used a l...

Страница 15: ...roof routing 4 Perform a leak test in accordance with the applicable regulations 5 2 5 Installing the pump chamber extension When using A15 and B125 pump cover CAUTION The max installation depth of 27...

Страница 16: ...ed for height compen sation to the surface level up to a maximum of 200 mm above the top edge of the pump chamber including the pump cover height The concrete rings should be provided by the customer...

Страница 17: ...mp chamber must be continuously checked for a plumb vertical and constant position and for any deformation or other indications of installation errors The areas directly adjacent to the pump chamber w...

Страница 18: ...content grain size 0 32 mm as far as the base of the substructure and compact properly Dpr 97 Compact by hand at the pump chamber wall ensuring that the pump chamber is in a plumb vertical position a...

Страница 19: ...ff device Suspend the chain from the discharge pipe observing the separate installation and operating instructions for the chain and lower the pump and discharge pipe into the pump chamber until the t...

Страница 20: ...t can be vented Alternatively a bubbling through system can be used In this case a small compressor continuously pumps air into the dynamic pressure bell In addition we recommend installation of an ad...

Страница 21: ...e 120 120 120 120 Switching point C Set Pump off signal when using dynamic pressure bell and level sensor then set follow up time up to dimension A pump off set follow up time if there is no inlet If...

Страница 22: ...lve can be installed to protect against the pump chamber being drained dry Both of these components are available as accessories Flush connection Fig 14 Flush connection installation 1 Surface couplin...

Страница 23: ...ired by the operating personnel for safe commissioning and operation of the pump chamber The following general conditions must always be met and checked The maximum inflow must be lower than the maxim...

Страница 24: ...al regulations are met Check that all required components and connections inlet dis charge pipe with shut off device venting electrical connection are present and properly installed 1 Open the pump co...

Страница 25: ...health must be decon taminated after being lifted out of the pump chamber before any other work is carried out Otherwise there is a risk of death Wear the necessary physical protection equipment BEWAR...

Страница 26: ...l substances Toxic or harmful substances in sewage pump chambers can lead to infections or suffocation The installation location must be adequately ventilated before all work Appropriate protective eq...

Страница 27: ...s Faults may only be repaired by qualified specialist personnel Observe the installation and operating instructions for the pump level control device and other accessories If the operating fault canno...

Страница 28: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: