46
7.3
Pipe connection
- Connect the pump to the pipes by using approp-
riate counterflanges, bolts, nuts and gaskets.
CAUTION!
Tightening of bolts must not exceed 80 Nm
Use of impact wrench is prohibited.
-
The circulation sense of the fluid is indicated on
the identification label of the pump.
- Pump must be installed in such a way that it is
not stressed by the pipework. The pipes must be
attached so that the pump does not bear their
weight.
- It is recommended that isolation valves be ins-
talled on the suction and discharge side of the
pump.
- Use of expansion joints may mitigate noise and
vibration of the pump.
- As regards the nominal cross-section of the suc-
tion pipe, we recommend a cross-section at least
as large as that of the pump connection.
- A check valve could be placed on the discharge
pipe in order to protect the pump against ham-
mer shock.
- For direct connection to a public drinking water
system, the suction pipe must also have a check
valve and a guard valve.
- For indirect connection via a tank, the suction
pipe must have a strainer to keep any impurities
out of the pump and a check valve.
- In case of half flanges pump design, it is recom
-
mended to connect the hydraulic network and
then keep out the plastic fixation links to pre
-
vent any leakage risk.
7.4
Electrical connections
DANGER! Risk of fatal injury!
Hazardous voltage due to the discharge of the
converter capacitors.
•
Before any work on the converter, wait for
5 minutes after disconnecting the power supply.
•
Check that all electrical connections and con
-
tacts are not live.
•
Check that the pressure connection terminals
have been allocated correctly.
- The supply cable must be routed in such a way
that it does not contact the pipework and/or
pump and motor casing.
- The power cable (3 earth) must be fed
through the threaded cable connection shown in
black below.
Non-assigned threaded cable connections must
remain sealed with the plugs provided by the
manufacturer.
-
The power supply cable (3 earth) must
be inserted into the gland indicated below in
black.
- The glands that aren’t used must remain sealed
using plugs provided by the manufacturer.
Power (kW)
11
15
18.5
22
M32/M40
Power (kW)
5.5
7.5
M25
Power (kW)
0.55 0.75
1.1
1.5
2.2
3
4
M25
English
WILO SE 03/2019
Содержание Helix VE 10 Series
Страница 2: ......
Страница 3: ...Fig 1...
Страница 4: ...Fig 2...
Страница 5: ...Fig 3 Fig 6 Fig 7...
Страница 7: ...Fig 8 Fig A1 1 1...
Страница 8: ...2 4 3 Fig 2D Fig 3D 4 3 2 Fig 4D 3 4 2...
Страница 130: ...130 WILO SE 03 2019 1 1 1 2 2 1 2 2 2 3 2 4 2 5...
Страница 131: ...131 HELIX VE 22 36 52 2 6 2 7 2 8 4 3 4 4 1...
Страница 135: ...135 HELIX VE 22 36 52 7 2 2 10 5 2 7 8 9 a b 10 A1 A2 A3 A4 1 _ 2 3 4 6 2 Helix Helix Helix 40 Helix 8 7 7 1...
Страница 136: ...136 WILO SE 03 2019 IP55 7 3 80 7 4 5 3 11 15 18 5 22 M32 M40 5 5 7 5 M25 0 55 0 75 1 1 1 5 2 2 3 4 M25...
Страница 142: ...142 WILO SE 03 2019 100 100 4 20 0 0 2 2 4 4 20 10 0 2 0 1 100 100 0 20 0 0 20 10 2 10 0 10 S1 S2...
Страница 147: ...147 HELIX VE 22 36 52 Fig A1 1 OFF OPERATION 1 OFF OPERATION PID 1 OFF OPERATION Information Service...
Страница 149: ...149 HELIX VE 22 36 52 Fig A2 EASY EXPERT EXPERT Fig A4 Information EASY Fig A3...
Страница 153: ...153 HELIX VE 22 36 52 Fig A5 Information SSM SBM Ext Off INFORMATION 4000...
Страница 154: ...154 WILO SE 03 2019 9 15 000 7 1 7 2 6 10 2 ON 7 0 0 0 2 OFF A1 1...
Страница 155: ...155 HELIX VE 22 36 52 Wilo 10 O cy c ye 20 30 Wilo...
Страница 156: ...156 WILO SE 03 2019 9 2 SBM 5 7 6 0 3 1 2 3 SSM 1 6 6 24 SBM 24 SBM SSM 1 2 3 4 5 6 24...
Страница 158: ...158 WILO SE 03 2019 10 2 6 0 0 0 24 1 6 300...
Страница 159: ...159 HELIX VE 22 36 52 11 Wilo www wilo com 12 www wilo recycling com...
Страница 196: ......