en
Installation and operating instructions • Wilo-Flumen OPTI-TR 50-3 ... 120-1, Wilo-Flumen EXCEL-TRE 50-3 ... 90-2 • Ed.01/2022-07
19
CAUTION
Material damage due to incorrect fixation
Defective fixation may limit the functionality of the mixer or damage it.
• If the mixer is fixed to a concrete structure, use anchor bolts for fixa-
tion. Follow the manufacturer’s installation instructions! Temperature
specifications and hardening periods must be strictly observed.
• If the mixer is fixed to a steel structure, ensure that the structure is
sufficiently strong. Use fixation materials with sufficient strength!
Use suitable materials to avoid electrochemical corrosion!
• Tighten all screwed connections. Observe torque specifications.
•
Wear protective equipment! Observe the work regulations.
–
Protective gloves: 4X42C (uvex C500 wet)
–
Safety shoes: Protection class S1 (uvex 1 sport S1)
–
Wear a safety harness.
–
Safety helmet: EN 397 Conforms to standards, protection against lateral deformation
(uvex pheos)
(When using lifting equipment)
•
Prepare the installation site:
–
Clean, free of coarse solids
–
Dry
–
Frost-free
–
Disinfected
•
Work must always be carried out by two persons.
•
Demarcate the working area.
•
Keep unauthorised persons away from the working area.
•
From a working height of more than 1 m (3 ft) above the ground, use scaffolding with a
safety harness.
•
Toxic or asphyxiating gases may build up during work:
–
Observe protective measures in accordance with work regulations (gas measurement,
carry a gas detector with you).
–
Ensure adequate ventilation.
–
If toxic or asphyxiating gases accumulate, leave the workplace immediately!
•
Install lifting equipment: even surface, clean, firm base. Warehouse and installation loca-
tion must be easily accessible.
•
Attach chain or wire rope to handle/attachment point with a shackle. Only use lifting
gear that has been technically approved.
•
Do not stay within the swivel range of the hoisting gear.
•
All connection cables must be laid properly. The connection cables must not pose any
risk (i.e. tripping, damage during operation). Check whether the cable cross-section and
the cable length are sufficient for the selected installation type.
•
Observe minimum clearances to walls and any fixtures.
6.4.1
Maintenance tasks
After a storage period of more than 12 months, carry out the following maintenance tasks
before installation:
•
Rotate propeller.
See section “Rotating the propeller [
•
Oil change in sealing, gear and pre-chamber.
See section “Oil change [
35]”.