background image

Installation and operating instructions Wilo-Control MS-L 2x4kW

 31

TRANSPORT AND STORAGE English

3.4.3.  Switchgear

Mains connection:

1~230 V or 3~400 V

Frequency:

50/60 Hz

Max. current:

12 A per pump

Power consumption:

Contactor taut: 15 VA

Downtime status: 8 VA

Max. switching capacity P

2

:

4 kW, AC3 per pump

Max. fuse protection on 

mains side:

25 A, slow-blow (16 A*, 

slow-blow)

Activation type:

Direct start-up

Ambient/operating temper-

ature:

-30 to +60 °C

Storage temperature:

-30 to +60 °C

Max. relative humidity:

50 %

Protection class:

IP 54

Control voltage:

24 VDC

Alarm contact switching 

capacity:

max. 250 V~, 1 A

Housing material:

Polycarbonate, UV-resistant

Housing dimensions (Wx

-

HxD):

289x239x107 mm

Electrical safety:

Degree of contamination II

*"S" version with shock-proof/CEE16 plug

3.5.  Type key

Example: Wilo-Control MS-L 2x4kW-M-DOL-S

MS

Micro Control switchgear for fixed speed pumps

L

Level-dependent control of the pump

2x

Max. number of pumps that can be connected

4kW

Max. permissible rated power (P

2

) per pump

M

Mains connection:

None = Choice of 1~230 V or 3~400 V

M = alternating current (1~230 V)

T4 = three-phase current (3~ 400 V)

DOL

direct-on-line starting of pumps

S

Version of switchgear:

Without = standard version with main switch

S = Version for lifting units without main switch, 

with cable and plug

O = Version without main switch and without 

plug

3.6.  Options

By inserting a rechargeable battery (available 

as an accessory) alarm signals can be emitted 

independent of the electricity network in case of 

a fault. An audible constant tone will be emitted 

as an alarm.

3.7.  Scope of delivery

Standard variant and "O" variant

• Switchgear

• 

2x reducing seals for threaded cable connection

• 

2x assembled jumper wires for mains connection

• Installation and operating instructions

Variant "S"

• 

Switchgear with connected cable and plug:

• 

1~230 V: Shockproof plug

• 

3~400 V: CEE phase inverter plug with phase 

inverter

• Installation and operating instructions

3.8.  Accessories

• Float switch for wastewater and sewage free of 

faeces

• Float switch for abrasive sewage containing 

faeces

• 

NiMH rechargeable battery (9 V/200 mAh) for 

alarm signals to indicate a power failure

• 

Horn 230 V, 50 Hz

• 

Flash light 230 V, 50 Hz

• 

Signal lamp 230 V, 50 Hz

Accessories have to be ordered separately.

4.  Transport and storage

4.1.  Delivery

On delivery, check immediately that the ship-

ment is complete and undamaged. If any parts 

are damaged or missing, the transport company 

or the manufacturer must be notified on the day 

of delivery. Claims made after this date cannot be 

recognised.  Damage to parts must be noted on 

the freight documentation.

4.2.  Transport

Only the packaging used by the manufacturer or 

supplier may be used for transport. This normally 

precludes the possibility of damage occurring 

during transport and storage. The packaging 

should be stored in a safe place for reuse if the 

product is frequently used at different locations.

4.3.  Storage

On delivery, switchgears may be placed into tem-

porary storage for up to 1 year until use providing 

the details below are observed.

The following should be taken into consideration 

for storage:

• 

Place the packaged switchgear on a firm subsur

-

face.

• 

The switchgears may be stored from -30 °C to 

+60 °C at a max. relative air humidity of 50 %. 

The store room must be dry. We recommend 

a frost-protected room for storage with a tem

-

perature between 10 °C and 25 °C and a relative 

air humidity of 40 % to 50 %.

Avoid formation of condensate!

• Seal the threaded cable connections securely to 

prevent ingress of moisture.

• Connected power supply cables and attached 

plugs should be protected from kinking, damage, 

and moisture.

Содержание Control MS-L 2x4kW Series

Страница 1: ...e manutenzione pt Manual de Instala o e funcionamento nl Inbouw en bedieningsvoorschriften da Monterings og driftsvejledning sv Monterings och sk tselanvisning fi Asennus ja k ytt ohje el hr Upute za...

Страница 2: ...Fig 1 1 2 3...

Страница 3: ...SSM Alarm GL WSK P2 WSK P1 SL 10 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 HW T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO L1 L2 L3 N WSK M 3 WSK M 1 T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO ON DIP 1 2...

Страница 4: ...50Hz U brown yellow green pink grey brown black grey blue V W white P1 P2 ON OFF ON NW 16 black brown black grey blue brown 30 15 0 Seconds ON 100 K DIP 1 2 3 4 5 6 7 SSM Alarm GL WSK P2 WSK P1 SL 10...

Страница 5: ...N 100 K DIP 1 2 3 4 5 6 7 SSM Alarm GL WSK P2 WSK P1 SL 10 16 15 14 13 12 11 9 8 7 6 5 4 3 2 1 HW T1 1 3 5 13 A1 2 4 6 14 A2 T2 T3 L1 L2 L3 NO L1 L2 L3 N WSK M 3 WSK M 1 T1 1 3 5 13 A1 2 4 6 14 A2 T2...

Страница 6: ...ry 32 5 Installation 32 5 1 General 32 5 2 Types of installation 32 5 3 Installation 32 5 4 Electrical connection 33 6 Operation and function 36 6 1 Controls 36 6 2 Button lock 37 7 Commissioning 37 7...

Страница 7: ...refers to the switchgear indicated on the title page 1 5 Warranty In general the specifications in the current gen eral terms and conditions apply for the warranty You can find these here www wilo co...

Страница 8: ...les and or insulation the switchgear must be shut down immediately by the operator Tools and other objects should be kept in their designated places so that they can be found quickly The switchgear ma...

Страница 9: ...with buttons 2 LED indicators The switchgear comprises the following main components Main switch for switching the switchgear on off NOTE The S version has no main switch A plug is pre assembled inste...

Страница 10: ...ns connection Installation and operating instructions Variant S Switchgear with connected cable and plug 1 230 V Shockproof plug 3 400 V CEE phase inverter plug with phase inverter Installation and op...

Страница 11: ...must be clean dry and free of vibrations Avoid exposing the switchgear to direct sunlight The customer must provide the power supply cables These must be of sufficient length so that connection to the...

Страница 12: ...by an electrician authorised by the local energy supply company Observe the installation and operating in structions for the connected pump and signal transmitters The mains connection current and vo...

Страница 13: ...ct ed to the earth terminal NOTE With the S version the pump is connected at terminals 2 T1 L 4 T2 N Pump connection 3 400 V Terminals 2 T1 U 4 T2 V 6 T3 W The protective ground conductor PE is con ne...

Страница 14: ...inals 11 12 and 13 of the termi nal strip DANGER due to electrical voltage An external voltage is applied at the terminals for this function This is also present at the terminals when the main switch...

Страница 15: ...ill be emitted independent of the electricity network on power failure An audible constant tone will be emitted as an alarm 1 Place the rechargeable battery in the holder Pay attention to the correct...

Страница 16: ...fault signal relay deactivated during an alarm signal with the Buzzer OFF Reset button Faults cannot be acknowledged nor can the control be released 7 Commissioning POTENTIALLY fatal danger due to ele...

Страница 17: ...direction of rotation and set Observe the wire designations on the wiring diagram when connecting the switchgear and the connected pumps 7 4 1 Checking the direction of rotation The rotation control o...

Страница 18: ...rdingly Ambient operating temperature 30 60 C Air humidity 40 50 Prevent formation of condensate BEWARE of moisture Ingress of moisture will result in damage to the switchgear During standstill time p...

Страница 19: ...ectrician or Wilo Customer Service 9 3 Repair work Prior to repair work the switchgear must be switched off as described under Final shutdown and all power supply cables dismantled Repair work must be...

Страница 20: ...ooting If the points listed here do not rectify the fault contact Wilo Customer Service They can help you as follows Telephone and or written support from Wilo Customer Service On site support from Wi...

Страница 21: ...ung folgenden einschl gigen Bestimmungen entspricht in its delivered state complies with the following relevant provisions est conforme aux dispositions suivants dont il rel ve Niederspannungsrichtlin...

Страница 22: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: