All information, illustrations and specifications in this manual are based on the latest information
available at the time of publication. We reserve the right to make changes at any time without notice.
16
3.0. Transport
3.2. Transporting GREENS TERRA SPIKE
…..CAUTION - DANGER !
Watch out when cutting through
the taut bands.
There is a risk of being
injured by the suddenly
opening bands.
Transport Using a Forklift
If GREENS TERRA SPIKE is still
fastened to the shipment frame:
•
Insert the fork under the
shipment frame
•
Unload GREENS TERRA SPIKE from
the carrier vehicle when
balanced.
•
Cut through the taut bands.
•
Connect GREENS TERRA SPIKE to
the tractor and lift it from
the shipment frame.
(See item 4.2.)
Transport Using a Crane
•
Fasten ropes or belts at
drill-hole (A) only,
•
Unload GREENS TERRA SPIKE when
suspended reliably.
Note:
Immediately inform in writing
the transport company and
Wiedenmann GmbH or the supplier
about shipping damage or missing
parts.