Ku nsts tof fsch wei ßte chni k
Starting and Operating
Chapter 5
12.02.04
Working Instructions WIDOS HRG 14, Segment
Page 20 of 42
5.2. Setting the Heating Element Temperature
Display = Display of the actual value
Push shortly the button P (1), the display show s <SP>, change desired value w ith buttons
(2) (3). Push shortly the button P (1), actual temperature is displayed again (or automatic
change after 30s). During heating up to desired value, the control lamp K2 (4) is on. As soon
as the desired temperature is reached, the control lamp K2 (4) is blinking.
5.3. Planing Process
•
The pipes have to be clamped for the planing process in such a w ay that the pipe ends
project at least for 110 mm to the inside at the left and at the right clamping ring.
•
Planing should be performed w ith a pressure of about 20 bar.
•
Insert the planer betw een the clamping devices by means of a crane and lock the
supporting fork.
•
Sw itch on the planer at the sw itch and plane the pipe ends until a revolving cutting has
been formed (3x).
•
Move the pipe ends aw ay from each other until the cutting gets off. Sw itch off the planer
not until now
.
•
Take out the safety bolt and put the planer back into the reception box by means of the
crane.
1
3
2
4
Safety bolt for the planer support. It
must be turned until it can be passed
through totally.
For removing the planer, pull out
only the safety bolt above.
The supporting fork then turns
automatically around the pivot into
direction of the arrow .
Pivot of the supporting fork