Foundation: 2207, 2208 DIN 16932 German association for welding
Use for:
HRG 8 / 10 / 12 / 14 / 16
1 bar on manomete
463
N
time to
chan ge- reach full
over
weld ing cool-down time
0,10 (PP)
time
pressure
pressure in
T
desired
temperature
time
pipe
pipe
SDR
bead -up circu lar
heat -up
max.
time
weld ing cool-
diame ter wall
pressure bead
time
chan ge- to reach pressure down
OD
(s)
[bar]
min.
[s]
over
weld ing [bar]
time
[mm]
[mm]
[mm]
time
pressure
[min]
[s]
[s]
5
Table for PP
Additional to the giv en bead-up f orce and to the welding f orce the mov ing f orce of the support must be added !
The standard v alue f or heating element temperature is 210° C +/- 10° C.
welding area
in welding area
The
smal ler
the pipe wall the
high er
the temperature.
P (N/mm²)
bead -up
heat-up
1000
24,5
41
17
1,5
385
11
21
17
38
1000
30,6
33
21
2,0
436
12
26
21
46
1000
38,2
26
25
2,5
492
14
33
25
56
1200
29,4
41
24
2,0
426
12
25
24
45
1200
36,7
33
29
2,0
483
14
32
29
55
1200
45,9
26
36
2,5
536
16
40
36
65
1400
34,3
41
32
2,0
464
13
30
32
51
1400
42,9
33
40
2,5
519
15
37
40
62
1400
53,5
26
49
3,0
574
18
46
49
73
1600
39,2
41
42
2,5
498
15
34
42
58
1600
49,0
33
52
2,5
554
17
42
52
69
1600
61,2
26
64
3,0
605
19
52
64
81
5
Remaining under the cool-down time for up to 50% is allowed under the following condition
•
pref abrication under workshop conditions
•
low additional pressure at unclamping
•
no additional pressure during f urther cooling down
•
load onto the workpieces only af t er being completely cooled down
12.02.04
Working Instructions WIDOS HRG 14