21759-6-0608
Page 11
Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important to
allow for finished face when setting the depth of the frame.
3. Attach fireplace to frame using adjustable frame. Preset
depth to suit facing material (adjustable to 1/2", 5/8" or 3/4"
depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of drywall strip to determine final depth.
Figure 8
Vent Pipe Clearance
Note:
Maintain one inch (1") of clearance around vertical vent
pipe.
See Figure 9A.
For horizontal vent, maintain a minimum
1" clearance to the bottom and sides of the vent, and 3" clearance
to combustibles above the vent pipe.
See Figure 9B
Figure 9A
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
Top of Vent
Combustibles NOT
allowed in shaded
area
1"
1"
3"
(25 mm)
8” Diameter
intake vent
5” Diameter flue
(25 mm)
(76 mm)
Figure 9B
INSTALLATION
Содержание DVP42FP
Страница 48: ...21759 6 0608 Page 48 Figure 82 OPTIONAL THERMOSTAT OPTIONAL WALL SWITCH STANDING PILOT WIRING DIAGRAM ...
Страница 56: ...21759 6 0608 Page 56 INTERMITTENT PILOT TROUBLESHOOTING continued ...
Страница 60: ...21759 6 0608 Page 60 WIRING DIAGRAM WITH BLOWER Figure 85 RF WIRING DIAGRAM ...
Страница 71: ...21759 6 0608 Page 71 SERVICE NOTES ...