are obtained by separate control of the cooler b l owers and
by manipulation of the by-pass valve
(
Zl8W
)
. The safety by
pass valve
(
WZ lW
)
protects the cooler radiator s from exces
sive head pres sure and the vacuum tube s ockets from exces
s ive back pres sure .
In addition to the above-mentioned controls , indicators,
and safety device s , other valves and piping are installed
for quick and easy isolation and drainage of the several
branche s of the water c ircuit , and for isolating and drain
ing either coo ling unit without dis turbing the operation of
the system as a whole . Provision al so can be ma.de for di
verting the hot water into the hous e heating system and s o
utiliz ing its heat in cold weather .
Installation Notes
When the piping has been completely connected, the sys
tem should first be checked and flushed thoroughly with
clean water. To do this, insert vacuum tub es or dummies in
al l sockets and clos e al l valves including s ocket valves ,
drain cocks , and gauge cocks , excepting only the tank water
gauge valves . Fill both tanks with clean water and proceed
as follows :
Ob s erve and make notation of exact level of water in
each tank. Then open the fol lowing valves :
Tank inlet valves z 20. 1w and z 20. 2w
Tank outlet valves Z 21 . 1W and Z21 . 2W
Pump inlet valves Z l . lW and Z l . 2W
I s olating valve ZlC, in unit C
Isolating valve ZllW
By-pas s valve Zl8W
Gauge cocks at M4W and M5W
Open vents on pump chambers until water fl ows from vent s ,
showing pumps are primed, and then close vents .
31
Содержание 407A-4
Страница 1: ...9t 6P 1Yesf ern Electric 407A 4 RADIO TRANSMITTING EQUIPMENT Instruction Bulletin No 946p...
Страница 3: ......
Страница 111: ......
Страница 134: ......
Страница 136: ...J...