
WEMPE digital main clock 20097
Installation and putting into operation
18
V3.0 01/2011
1.1.2 Console mounting
1. Prepare the switchboard cut-out
according to the illustration.
NOTICE!
Size the drill hole diameter for M4
thread screws.
Ill. 5: Switchboard cut-out
2. Insert the main clock from above into the switchboard cut-out.
3. Place M4 thread screws from above into the edges of the main clock and fit them
tightly from the backside of the switchboard with washers and nuts.
4. Make sure that the main clock holds reliably and safely on the console.
1.4 Fitting of cables
1.1.1 Fitting of cables at the wall-mounting version
1. Unscrew both screws of the main clock’s terminal box cover and remove the cover.
2. Pierce a pre-cut hole for the cable
entry from the bottom to the inside.
Clean the cable hole.
NOTICE!
It is also possible to place the cable
entry on the back of the main clock.
For this effect:
a) Dismount the main clock in
reverse order from the wall.
(
1.1.1 Wall mounting).
b) Pierce a pre-cut hole from the
back to the inside.
c) Clean the cable hole. Insert the
cable according to the following
description.
d) Mount the main clock back on the
wall.
Ill. 6a: pre-cut holes on the bottom
Ill. 6b: pre-cut holes on the back
Содержание 20097
Страница 1: ...Operating Instructions WEMPE digital main clock 20097 ...
Страница 40: ...WEMPE digital main clock 20097 Annex 40 V3 0 01 2011 1 3 Circuit boards 1 1 1 Main board Ill 11 Main board ...
Страница 42: ...WEMPE digital main clock 20097 Annex 42 V3 0 01 2011 1 1 3 Oscillator board Ill 13 Oscillator board ...
Страница 59: ...WEMPE digital main clock 20097 Notice V3 0 01 2011 59 Notice ...