4.
GENERAL
Installation of the kettle must be accomplished by qualified installation
personnel working to all applicable local and national codes. Improper
installation of product could cause injury or damage.
This equipment is built to comply with applicable standards for
manufacturers. Included among those approval agencies are: UL, A.G.A.,
NSF, ASME/N.Bd., CSA, CGA, ETL, and others. Many local codes exist, and
it is the responsibility of the owner/installer to comply with these codes.
Observe all clearance requirements to provide proper make-up air
flow. Do not obstruct the flow of combustion and ventilation air. Check
rating plate to ensure that kettle has been equipped to operate with
the type of gas available at the installation.
RECEIVING INSPECTION
Before unpacking visually inspect the unit for evidence of
damage during shipping.
If damage is noticed, do not unpack the unit, follow shipping
damage instructions.
SHIPPING DAMAGE INSTRUCTIONS
If shipping damage to the unit is discovered or suspected,
observe the following guidelines in preparing a shipping
damage claim.
1.
Write down a description of the damage or the reason for
suspecting damage as soon as it is discovered. This will
help in filling out the claim forms later.
2.
As soon as damage is discovered or suspected, notify
the carrier that delivered the shipment.
3.
Arrange for the carrier's representative to examine the
damage.
4.
Fill out all carrier claims forms and have the examining
carrier sign and date each form.
VENTILATION
Gas fired kettles are only to be installed under
a ventilation hood in a room which has
provisions for adequate make up air. Further
information can be obtained by referring to
the U.S.A. National Fire Protection Associations NFPA96
regulations. These standards have also been adopted by
the National Building Code in Canada.
POSITIONING
CLEARANCE REQUIREMENTS TO COMBUSTIBLE
AND NONCOMBUSTIBLE SURFACES.
Table-top models must be positioned on a firm, level stand
(Cleveland ST-28 or ST-55 recommended), or existing counter
top, and bolted in place.
These models are supplied with mounting hardware. This
hardware threads into the welded bushing on the underside of
the base.
Once the kettle is secure, screw tilt handle into the threaded
hole provided at the right side of kettle.
14 1/2"
2
14 5/8"
10"
2 1/4" - KGT6T
3 1/4" - KGT12T/GB
24" - KGT6T
27" - KGT12T/GB
Model #
Back
Left Side
Right Side
KGT6T
4”
0
0
KGT12T/GB
4”
0
0
INSTALLATION
UNCRATING
Caution
:
Straps under tension and will snap when cut.
Carton may contain staples and Skid contains Nails.
Use proper safety equipment and precautions.
Unit is heavy use adequate help
or lifting equipment as needed.
1.
Carefully cut any straps from
container.
2.
Lift off carton.
3.
Inspect for hidden damage.
If found refer to “SHIPPING
DAMAGE INSTRUCTIONS”.
4.
Cut strap holding unit.
5.
Remove wooden 1x6 holding
unit to skid.
Cut Straps
M
Model #
Unit
Unit with
shipping box
KGT6T
180 lbs.
220 lbs.
KGT12T
195 lbs.
235 lbs.
KGT12TGB
215 lbs.
255 lbs.
APPROXIMATE WEIGHTS
6.
Remove manual from
kettle pot. Write down
the model# and serial#
of the unit onto the
front of this manual.
7.
Lift kettle off skid and
move kettle to its
installation location.
8.
Discard packaging
material according to
local and or state
requirements.
Mounting
Hardware
Model
Serial #
1x6
Cut Straps
Содержание Cleveland KGT12TGB
Страница 27: ...26...