Carry out regeneration of the softener (for the
manual softener).
Check that there is salt in the container (for the
softener in the automatic version).
PERFORATED DISK
and
SEAL UNDER THE PAD
Every four months
replace the perforated
disk
delivery group (use only
original spare parts)
proceeding as follows:
Verify the correct functioning of the pressure
switches
Check for LIME SCALE on the heating elements
and boilers.
Check the efficiency of the SOLENOID VALVES of
the delivery groups.
Check for any HYDRAULIC LEAKS at the bench and
the efficiency of the drains.
NEGATIVE PRESSURE VALVE
1) first try :
remove the top grill of the machine;
use pliers to push the pin (5) downwards;
open the steam valves and drain off
all the pressure from inside the boiler;
turn the machine back on and check
for regular closure of the valve.
SAFETY OR PRESSURE RELIEF VALVE
1) first try :
remove the top grill of the machine;
- use pliers to pull the pin (6) upwards;
block the pressure switch contacts;
turn the machine back on and check
for pressure in the boiler to rise.
check for correct intervention of the
valve at a maximum pressure of 2 bar.
Activate the delivery groups for
about 30 seconds;
a gauge (available on request) to the delivery
group;
activate the delivery group, and use the gauge
to monitor pressure increase up to 8-9 bar;
Содержание Wegaconcept
Страница 1: ...ESPRESSO COFFEE MACHINE Use and maintenance manual for the TECHNICIAN ENGLISH Wegaconcept...
Страница 3: ...English...
Страница 7: ...7 Wegaconcept Technical manual ENGLISH Section I Operation...
Страница 58: ...58 Wegaconcept Technical manual 33 Electric diagrams 33 1 Electronic control unit diagram...
Страница 60: ...60 Wegaconcept Technical manual 33 2 Electronic control unit Diagram Rev 01...
Страница 69: ...69 Wegaconcept Technical manual ENGLISH Section IV Interfaces...
Страница 75: ......