Operation manual Soldos - SL (04-09) page 9 of 18
6.
Taking the unit into operation
6.1 Attaching the brine reservoir to the unit
Before taking the unit into operation the brine solution reservoir has to be
attached to the unit. At the programme switch the dosing performance is
adjusted by the pause- and spraying time. The programme switch is to
set up the type of operation, the test programmes and the cycle time for
the push-button operation.
When you take the unit into operation we recommend to set the pause-
and spraying time on a middle position (pause time 4 minutes/ spraying
time 25 seconds). Starting from this values the times have to be adapted
according to the basic conditions at the point of use (measures of the
room, steam quantity). The unit has to be switched-on with the main
switch on the right sight of the controller before it can be taken into
operation.
Attaching the brine reservoir:
1.
Screw-off the original lid of
the brine reservoir.
2.
Pull out the special lid from
the nipple of the suction tube
of the SOLDOS.
3.
Screw the special lid onto the
brine reservoir.
4.
Push the suction tube with
nipple into the special lid.
5.
Pull the connected reservoir
into the console. Pay
attention that the flange ring
sits correctly in the guiding.
2
3
4
5