Operation manual Soldos - SL (04-09) page 6 of 18
3. Installation
Before the installation of a SOLDOS all materials in the room have
to be checked on their corrosion resistance to brine solution!!!
If the SOLDOS is used in wodden cabinets the resistance of the
wood has to be checked. Additionally the wood has to be cleaned
regulary.
For the use in Saunas the Sauna Heater has to be resistant against
corrosion (stainless steel housing).
Attention!!! – please use only pure, disinfected WDT brine with a
salt concentration of app. 5%.
The SOLDOS has to be installed on a capable place next to the accordant
cabinet, but not directly on the back board of the wall as a disturbing noise
due to vibration might come up.
Electrical supply by power socket
230V/AC.
We recommend to install the hose pipe for the brine solution and for the
the compressed air in a standard empty conduit d20.
Minimum installation radius of the empty conduits should be 20cm.
SOLDOS SL
Nozzle with
covering
screen
Dosing pipe PTFE 4x1
Power supply
230V
Air pipe PE 6x1
Push-
button
(optional)