INSTALLATION MANUAL
3
1. GFCI OUTLET
5.
PIPE INLET
2. CHECK VALVE
6.
DISCHARGE PIPE
3. VENT PIPE
7.
SUMP PUMP
4. GASKET/BASIN LID
8.
SWITCH (SEE CHART A, ON
PAGE 3)
9. SUMP BASIN
10. FLOAT ROD
11. FLOAT GUIDE
12. SWITCH ARM
TYPICAL SUMP INSTALLATION
1. This installation must be in accordance with the National
Electric Code and all applicable local codes and
ordinances.
2. Use a basin that is large enough to accommodate the
pump. The minimum requirements for the sump pumps
are:
CHART
— A
Switch Type
A
Minimum
Basin Diameter
B
Minimum
Basin Height
Tether Float Switch
14 in.
22 in.
Diaphragm Switch
11 in.
22 in.
Vertical Float Switch
11 in.
22 in.
CHART
— B
Switch Type
A
Minimum
Basin Diameter
B
Maximum
Basin Height
Pedestal Float Switch
(Figure 2, on page 2)
14 in.
24 in.
3. Clean the basin of all debris.
4. Assemble switch or float if needed. Refer to
warranty
and service
parts sheet
for specific directions.
5. Set the pump on a solid, level surface. Do not place
pump directly on clay, earth, gravel or sand. A brick or
block may be installed under the pump to provide a solid
base.
6. Position pump so the switch is away from the inlet so
switch is clear from incoming water. Verify the switch has
at least 1 in. clearance to the side wall of the basin and is
free to move throughout its movement. If optional control
device or float is used, follow mounting instruction
supplied with device or float.
Содержание CDU980E
Страница 10: ...INSTALLATION MANUAL 10 NOTES...
Страница 17: ...MANUEL D INSTALLATION 17 pr venir les blessures personnelles et contenir les gaz et les odeurs...
Страница 35: ...MANUAL DE INSTALACI N 35...