background image

Tools Needed:

7

Please Do Not Return This Product To The Store. 

Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your 

local yellow pages/business listings or go to the 

Find a Dealer

 section online at 

www.wayne-dalton.com

PRE-INST

All

ATION

Fig. 2

a TorqueMaster

®

 spring system can be 

identified by the end brackets. for single 

spring applications, the right hand end 

bracket will always have a drive gear, 

counter gear, counter cover, and a winding 

bolt head. The left hand end bracket will 

have no gears, counter cover, or winding 

bolt head. The hole for the winding bolt 

head will be plugged.
for double springs, both the right hand 

and left hand end brackets will always 

have a drive gear, counter gear, counter 

cover and a winding bolt head.

IMPORTANT:

  RIGhT aND  lEfT  haND  Is 

alWays  DETERMINED  fROM  INsIDE ThE 

BuIlDING lOOkING OuT.

Step 1: If you have a black counter cover:

Place a mark on the drive gear tooth and an 

adjacent mark on the right hand end bracket 

(fig. 1). loosen the lock nut 1/4 turn using a 

7/16” wrench and continue with step 2.

If you have a gray counter cover:

 loosen 

the lock nut 1/4 turn using a 7/16” wrench 

and continue with step 2.

Step 2:

 using an electric drill (high 

torque / gear reduced to 1300 rpm 

preferred) with a 7/16” hex head driver, 

unwind the right hand winding bolt head 

counterclockwise (fig. 2) and count the 

number of turns the mark on the drive 

gear passes the adjacent mark on the end 

bracket. Referencing the chart below, by 

door height, stop unwinding the spring 

once the counted turns have reached the 

listed number of turns.

 

6’-0” Door height = 14 turns

 

6’-3” Door height = 14 1/2 turns

 

6’-5” Door height = 15 turns

 

6’-6” Door height = 15 turns

 

6’-8” Door height = 15 1/2 turns

 

6’-9” Door height = 15 1/2 turns

 

7’-0” Door height = 16 turns

 

7’-3” Door height = 16 1/2 turns

 

7’-6” Door height = 17 turns

 

7’-9” Door height = 17 1/2 turns

 

8’-0” Door height = 18 turns

CAUTION: 

DO  NOT  usE  IMPaCT  GuN TO 

uNWIND sPRINGs.

IMPORTANT: 

DO  NOT  REfERENCE ThE 

COuNTER  COVER WhEN  COuNTING ThE 

NuMBER  Of  TuRNs  BEING  uNWOuND 

ON  ThE  sPRING,  BuT  fOllOW  ThE 

INsTRuCTIONs aBOVE.

Step 3:

 Verify that spring tension has been 

released by pulling the counterbalance 

cable on the right hand cable drum away 

from the header (fig. 3). If spring tension 

has been released, the cable will be loose. 

In addition, the TorqueMaster

®

 

Fig. 1

Fig. 3

Fig. 4

RIGhT haND 

CaBlE DRuM

 TORquEMasTER

®

 

sPRING TuBE

ChECk CaBlE 

TENsION

lOOsEN lOCk 

NuT 1/4 TuRN

COuNTER 

GEaR/ COVER

RIGhT haND 

END BRaCkET

PlaCE MaRk ON END BRaCkET 

aND DRIVE GEaR TOOTh 

BEfORE uNWINDING sPRINGs

END BRaCkET

RIGhT haND 

WINDING BOlT hEaD

ElECTRIC DRIll 

WITh 7/16” hEx 

DRIVER (DO NOT 

usE IMPaCT 

GuN)

PRy COuNTER GEaR 

aND COuNTER COVER 

fROM END BRaCkET 

usING flaT TIP 

sCREWDRIVER

COuNTER 

GEaR

COuNTER 

COVER

TorqueMaster

®

 Spring Removal

P2

Recommended 

tools from 

page 5

Содержание 9100

Страница 1: ...hese instructions carefully before attempting installation If in question about any of the procedures do not perform the work Instead have a qualified door agency do the installation or repairs Copyri...

Страница 2: ...open section joints when closing a door Use lift handles gripping points when operating door manually 10 DO NOT permit children to operate garage door or door controls Severe or fatal injury could re...

Страница 3: ...ith your door Rollers as required Counter Covers as required idrive Operator sold separately 1 operator bracket lubricating oil as required 2 Horizontal Angle 21 15 16 or 80 as required 2 Top Bracket...

Страница 4: ...also be used in conjunction with identifying each sections The bottom section can be identified by a 1 end hinge the factory attached bottom astragal or by the bottom bracket warning labels on each en...

Страница 5: ...old door preparing the opening carefully otherwise severe or fatal injury could result If you have an existing door follow the instructions to identify which counterbalance removal is necessary The pr...

Страница 6: ...the ladder just off to the side of the winding cone The winding cone should be easy to reach without putting your body directly in front of it Step 2 Insert a winding bar into one of the holes in the...

Страница 7: ...ht hand winding bolt head counterclockwise Fig 2 and count the number of turns the mark on the drive gear passes the adjacent mark on the end bracket Referencing the chart below by door height stop un...

Страница 8: ...epeat Step 4 for the left hand side Holding the left hand end bracket steady with locking pliers carefully pry the end bracket off the winding shaft using a flat tip screwdriver Fig 7 Step 8 Remove th...

Страница 9: ...open position and place vice clamps to the back legs of both vertical tracks below the bottom rollers to prevent the door from falling By opening the door you release most of the spring tension Carefu...

Страница 10: ...Minimum side clearance required from the opening to the wall is 3 1 2 IMPORTANT Closely inspect jambs header and mounting surface Any wood found not to be sound must be replaced The jambs and header...

Страница 11: ...ve treated Stainless steel lag screws are NOT necessary when installing products on un treated lumber NOTE It is recommended that 5 16 x 1 5 8 lag screws be pilot drilled using a 3 16 drill bit and 1...

Страница 12: ...horizontal track If the horizontal angle is not welded the horizontal angle will be installed as shown Horizontal Angle Hammer horizontal TRACK HOrizontal Angle Horizontal Angle horizontal TRACK hole...

Страница 13: ...2007 mm QIJB 3 BOTTOM QIJB 5 BOTTOM QIJB 6 BOTTOM 7 6 82 TRACK 2083 mm QIJB 3 BOTTOM QIJB 5 BOTTOM QIJB 6 BOTTOM 7 9 85 TRACK 2159 mm QIJB 3 BOTTOM QIJB 5 BOTTOM QIJB 6 BOTTOM 8 0 4 SECTIONS 88 TRACK...

Страница 14: ...raised the height of the shim Position the left hand vertical track assembly over the rollers of the bottom section Make sure the counterbalance cable is located between the rollers and the door jamb...

Страница 15: ...Hinges have 2 screws and Intermediate hinges have 3 screws NOTE Install lock at this time sold separately see instructions in OPTIONAL SIDELOCK INSTALLATION on page 32 LOCK SECTION 8 2 1 4 14 X 5 8 S...

Страница 16: ...E Model 9400 9600 glazed top doors 13 0 wide or greater will be supplied with a 3 asymmetrical u bar for the top section Place the 3 asymmetrical u bar over the top rib Fasten each end of the u bar to...

Страница 17: ...or to installing top section locate the center of the top section and seat the operator bracket on male part of the top section For retro fit applications the operator bracket must be aligned with an...

Страница 18: ...section NOTE If an idrive opener will be installed position horizontal tracks slightly above level NOTE After completing this step continue with Step 16 key slot QUICK INSTALL TAB horizontal track ve...

Страница 19: ...bolt the horizontal angle to the slot in the flagangle using 1 3 8 16 x 3 4 truss head bolt and 1 3 8 16 hex nut Repeat for other side Remove the nail that was temporarily holding the top section in p...

Страница 20: ...8 Center Bracket Bushing NOTE If you are installing the idrive opener on your garage door skip this step and continue with Step 19 NOTE If you are not installing the idrive opener on your garage door...

Страница 21: ...ting to slide opener over the left end of the TorqueMaster spring tube can damage the internal electronics Once aligned slide the opener onto the right hand end of the TorqueMaster spring tube As the...

Страница 22: ...ing tube are cam shaped to fit together only one way To install the cable drum slide the correct cable drum over the winding shaft until the cable drum seats against the TorqueMaster spring tube The w...

Страница 23: ...OTE On single spring applications no drive gear is required on the left side NOTE If additional lubricating oil is needed use Dura Lube Engine Oil Treatment Winding Shaft Splines Flagangle 36 tooth wo...

Страница 24: ...ft hand side for single spring applications Only an end bracket is needed IMPORTANT At this time do not wind Counterbalance Springs Winding Shaft Inside End Bracket Missing Tooth Raised Rib Counter Co...

Страница 25: ...to the top of the door section with the idrive resting on the support bracket Once TorqueMaster spring tube is level drill 1 8 pilot holes for the lag screws Then secure support bracket to the mounti...

Страница 26: ...assembly together Thread the disconnect cable behind the counterbalance cable through the hole in the right hand end bracket remove all slack between opener and right end bracket Attaching Disconnect...

Страница 27: ...n 6 20 x 1 2 screw into the disconnect handle until snug and then tighten screw an additional 1 to 1 1 2 turns to secure disconnect cable to the disconnect handle Trim off excess cable from bottom of...

Страница 28: ...CT GUN TO WIND SPRING S Securing Door for Spring Winding Track vice clamps attached to inner rail of track Vice Clamp Counterbalance Cable Set Screw Cable Drum Locking Pliers Flat Tip Screwdriver Cam...

Страница 29: ...e and carefully rotate the winding bolt head clockwise until the counter shows the correct number of turns for your door For DOUBLE SPRING applications remain on the left hand side and carefully rotat...

Страница 30: ...e building looking out Drum Wrap Cable Drum Drum Wrap Cable Drum None Outside Flange Rear Support Keep horizontal track parallel and within 3 4 maximum of door edge otherwise door could fall resulting...

Страница 31: ...s afterwards To adjust spring s only add or remove 1 4 turn on the counter at a time Adjust both sides equally IMPORTANT Do not add or remove more than 1 spring turn from specified amount If the door...

Страница 32: ...0 x 11 16 self drilling screws 1 8 Power Drill 7 16 Socket Driver DoorMasterTM Bracket NOTE When installing a DoorMasterTM operator use the center bracket and drive gear supplied with your operator lo...

Страница 33: ...rews provided Install one 8 x 3 4 screw in the bottom step plate hole The screw in the top hole varies with door models Use the screw size shown below for your model door a 8 x 3 4 screw for Model 910...

Страница 34: ...or may not have to cut straight arm to accomplish trolley settings as shown in FIG 2 4 through FIG 2 5 Attach door arm to trolley and align the appropriate door arm hole with the hole in the door ope...

Страница 35: ...and centered on the vertical line as shown in FIG 3 2 Spot the wall brackets mounting holes on the header wall and then refer to your garage door operator manual for pre drilling and securing the wal...

Страница 36: ...T CLOSE AND A CLOSING DOOR OPENS IF PHOTOELECTRIC EYE SYSTEM IS OBSTRUCTED FAILURE TO MAKE ADJUSTMENTS IF NECESSARY CAN RESULT IN SEVERE OR FATAL INJURY 1 Install operator rail 1 2 to 1 1 2 13 38 mm a...

Страница 37: ...ill scratch the acrylic glazing Dry glazing with a clean damp chamois NOTE DO NOT USE any window cleaning fluids scouring compounds gritty cloths or solvent based cleaners of any kind Surface Preparat...

Страница 38: ...Continued NOTES 1 Repainting of finish painted steel doors cannot be warranted as this condition is totally beyond the door manufacturer s control 2 Consult a professional coatings contractor if in do...

Страница 39: ...ess Manufacturer s preparation and painting instructions are followed explicitly This Limited Warranty will be voided if any holes are drilled into the door other than those specified by the Manufactu...

Страница 40: ...ore Covered by one or more of the following Patents 5 408 724 5 409 051 5 419 010 5 495 640 5 522 446 5 562 141 5 566 740 5 568 672 5 718 533 6 019 269 6 089 304 6 644 378 6 374 567 6 561 256 6 527 03...

Отзывы: