Closing and sealing against fumes and gas
If there are any gaps between the pipe and the wall, seal these
using putty or intumescent strips according to the thickness,
to prevent the passage of fumes in the event of a fire.
Cleaning the pipe
The expansion of the intumescent material in the collar com-
pletely closes the plastic pipes by a mechanical action. If the
pipes are very dirty or have mortar residues, this may delay
the action. Clean the surface of the plastic pipe in the point of
installation of the fire protection collars.
NB: the fire protection collar can only prevent the passage of
fire if it is properly installed
Precautions
In the case of contact of the intumescent material with the
eyes, wash delicately with soap and water. Keep out of the
reach of children.
Installation manual Wavin
fire protection collar BM-R90
Wavin BM-R90 is a new fire protection sleeve designed for
use with Wavin domestic waste water removal piping systems
according to DIN 4102-11. It is suitable for use on piping with
external diameters of up to 200 mm and is able to provide a
secure seal for use in all conceivable installation situations:
Right-angled wall and ceiling penetration
Lightly-constructed partition walls
Angled wall and ceiling penetration to 45˚
For sealing over pipe collars (to 45˚)
For installation under ceilings and in front of walls
Installation flush with ceiling surface
BM-R90 installation instruction
The BM-R90 fire collar provides fire resistant sealing for wall
and ceiling installation of the Wavin AS acoustic insulation
systems and other selected Wavin soil and waste systems.
General recommendations
(1) Positioning of the collars:
On both sides of a wall; on one side under/in a ceiling
(see figure 37).
(2) Wall & ceiling types:
At least 10 cm thick solid concrete, aerated concrete and
sand-lime brick walls as well as light dividing walls (stud
walls: both sides clad with 12.5 mm plasterboard) and solid
concrete and aerated concrete ceilings at least 15 cm thick.
(3) Structural acoustic insulation:
The acoustic insulation mat provided must be wrapped
around the pipe where it passes through the wall or ceiling.
(4) Joint sealing between pipe and wall/ceiling:
To be packed to the full thickness of the wall or ceiling using
mineral materials such as concrete, cement or plaster.
gap around the edge
15
0 m
m
BM-R90 collar
Acoustic insulation mat
Fig. 44: Straight installation with / without sleeve / socket.
Fig. 45: BM-R90 fire collar.