manualshive.com logo in svg
background image

Page 12

 

Register by mail, phone, fax or internet.   Premier uses this information only to provide a 

filter change reminder notice.  Pre-filters should be changed every 6 months and VOC filter 

annually.  You may register your system via our website at www.premierH2o.com or call 

1-800-752-5582 (within USA only) / FAX#: 623-866-5666. 

Don’t Forget To Register!

Start up Instructions

If you have connected your RO system to a refrigerator / ice maker, make sure the ice maker is 

off (do not allow water to flow to the ice maker) until flushing (Step 4) is complete and the tank 

has been allowed to fill completely. Connection from the RO to the ice maker system should 

have an in-line valve installed before the ice maker so it can easily be closed to prevent water 

flowing to the ice maker during start up and periodic maintenance. Your storage tank must be 

allowed to fill up fully in order for the ice maker system to work properly. 

After the storage tank has filled (the water trickling has stopped), open the RO Faucet to 

flush the tank completely. You will know that the tank is empty when the flow rate from the 

RO faucet is down to a trickle.  Repeat this step two more times.  The fourth tank can be 

used for drinking. 

Open the RO faucet and leave it open until water begins to trickle out (this may take a few 

minutes and the water will come out slowly).

Step 4

Turn on the incoming cold water at the angle stop valve and the 

Adapt-a-Valve. Check the system for leaks and tighten any fittings 

as necessary.   (Check frequently over the next 24 hours to ensure 

no leaks are present).

Step 3

Step 2

Note:

Step 1

Close the RO faucet allowing the storage tank to fill with water.

  It may take 3 to 6 hours to 

fill the tank completely depending on the production capability of the membrane, local water 

temperature and water pressure. 

Flushing of the tank 3 times is only necessary during the initial startup and after replacing the 
membrane.

During the fill period you may hear water trickling which is a normal occurrence.

Note:

Note:

Congratulations!

You have completed the installation of your new Reverse Osmosis system.

Please Follow the Startup Instructions.

The flushing process should take about a day to complete. 

ON

Содержание Premier WP4V-50

Страница 1: ...installation Your failure to follow any attached instructions or operating parameters may lead to the product s failure Watts Premier 8716 W Ludlow Drive Suite 1 Peoria AZ 85381 Phone 800 752 5582 www...

Страница 2: ...RO membrane This semi permeable membrane will take out TDS Sodium and a wide range of contaminants such as Chromium Arsenic Copper Lead as well as Cysts such as Giardia and Cryptosporidium and much m...

Страница 3: ...Installation 10 Drain Saddle Tube Connection 10 Reverse Osmosis Module Mounting 11 Green Tube Connection 11 Tank Elbow Installation 11 Connect Blue Tube from TANK Port on RO Module to the Tank 11 Con...

Страница 4: ...Operating Pressure Maximum 100 psi 7 0 kg cm2 Minimum 40 psi 2 80 kg cm2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity 5 NTU Hardness Maximum 1...

Страница 5: ...1 104017 Sediment Filter 10 Inch 5M 4 ALT 1 560016 RO Membrane 35GPD 4 1 560018 RO Membrane 50GPD 5 3 113018 Filter Bowl 6 1 113035 Membrane Vessel 7 3 113041 O Ring Filter Bowl 8 1 113045 O Ring Mem...

Страница 6: ...hen drilling Watts accepts no responsibility for damage resulting from the installation of faucet Diamond tip bit recommended Marble Counter top We recommend contacting a qualified contractor for dril...

Страница 7: ...b and Install Spout Figure C This RO faucet is equipped with quick connect fittings for easy tube installation To connect tubes simply push them firmly into their corresponding fitting on the RO fauce...

Страница 8: ...ur faucet will have a good seal Disassembling your faucet is never recommended as this could void your warranty If it is necessary to remove the fitting at the end of the toggle bolt you must follow t...

Страница 9: ...Hot water will severely damage your system 3 8 Configuration With Brass Fittings Insert White Washer 1 2 Configuration Without Brass Fittings White Washer Hot Supply Cold Supply Hot Supply Cold Supply...

Страница 10: ...e second drain Installation of the drain saddle near a garbage disposal may cause the drain line to plug If no other installation of drain line is available Premier offers drain line installation kit...

Страница 11: ...quick connect fitting on the RO Manifold Make sure the tube is pushed in all the way to the tube stop See Picture Connect red faucet tube Green Tube Connection Step 14 Locate green tube attached to t...

Страница 12: ...aucet to flush the tank completely You will know that the tank is empty when the flow rate from the RO faucet is down to a trickle Repeat this step two more times The fourth tank can be used for drink...

Страница 13: ...pty to depressurize before attempting to remove filter housings Open the RO Faucet and allow water to drain from the tank until it is completely empty Insert the new Carbon Block filter White End Caps...

Страница 14: ...inutes then continue rinsing eye Call a poison control center or doctor for treatment advice Step 4 With the RO faucet in the closed position turn on the incoming water supply to the system by turning...

Страница 15: ...ntil it stops Follow the green tube away from the RO system to find the adapt a valve Step 2 Open the RO Faucet and allow water to drain from the tank until it is completely empty Step 3 Remove the ho...

Страница 16: ...uge is recommended Check Air Pressure in the Tank Important Step 3 Check air pressure only when tank is empty of water Step 1 Turn off the incoming water supply to the RO Open the RO Faucet and allow...

Страница 17: ...or drain Air gap faucet Inherent sound with air gap faucets Location of drain saddle See diagram for proper location of drain saddle Higher capacity membrane Normal with high capacity membrane High wa...

Страница 18: ...omplete list of VOC s Recovery 13 7 Daily Production Rate 9 86 GPD Efficiency 6 8 Depending on water chemistry water temperature and water pressure Premier s R O Systems production and performance wil...

Страница 19: ...ne where it does convert trivalent arsenic to pentavalent arsenic may not convert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water utility contact the util...

Страница 20: ...ONITRILE 98 0 024 0 0006 DICHLOROACETONITRILE 98 0 0096 0 0002 TRICHLOROACETONITRILE 98 0 015 0 0003 HALOKETONES HK 1 1 DICHLORO 2 PROPANONE 99 0 0072 0 0001 1 1 1 TRICHLORO 2 PROPANONE 96 0 0082 0 00...

Страница 21: ...urchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6 months 4th stage VOC Block 1 year 3rd...

Страница 22: ...exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do not use with water that is micro biologically unsafe or of unknown quality without 9 adequate disinf...

Отзывы: