background image

9

 Annual Sanitization

NOTICE

Do not change your post-carbon fi lter until the sanitization 

has been completed.
The pre-fi lters and membrane can be changed before the 

sanitization

Step A – 

 Turn off the water supply to your 

RO system at the Adapt-A-Valve™ 

and open the RO faucet to drain 

the storage tank.

NOTICE

If you have connected your RO system 

to a refrigerator/ ice maker, make sure 

the connection has been turned off. Do 

not re-open the connection until the 

sanitization process is complete.
Step B – 

 Locate the tube that runs be-

tween your fi lter module and the 

storage tank and disconnect at 

both ends.

Step C – 

 Drain any remaining water in 

the tube

Step D – 

 Hold both ends of the tube 

together with the ends pointed 

away from your face. Using a 

dosing syringe (see fi gure) slowly 

insert 1 teaspoon (5 mL) of 

common household bleach 

into the tube.

WARNING

!

Do not use needle syringe

Step E – 

 While covering one end of the tube with your fi nger, insert 

the other into the tank. Then insert the open end into the 

fi lter module.

Step F – 

 Turn the incoming water back on and let the system fi ll for 

approximately 10 minutes

Step G – 

 Turn off the incoming water and let the system sit 

for 1 minute.

Step H – 

 Drain the system completely and then follow the startup 

procedure - fi lling then draining two full tanks of water.

Step I – 

 Replace the post-carbon fi lter once complete.

POINT HOSE
ENDS AWAY
FROM FACE

DOSING SYRINGE
WITH NO NEEDLE

DANGER

!

IF BLEACH GETS IN EYES: Hold eye 

open and rinse slowly and gently with 

water for 15 - 20 minutes. Remove 

contact lenses if present, after the 

first 5 minutes, then continue rinsing 

eye. Call a poison control center or 

doctor for treatment advice. 

 Check Air Pressure in the Tank

Procedure for Extended Non-Use 

(More than 2 months) 

NOTICE

Check air pressure only when tank is 

empty of water!

Check air pressure in the storage tank 

when you notice a decrease in available 

water from the RO system. Air can be add-

ed with a bicycle pump using the schrader 

valve that is located on the lower side of 

the tank behind the blue plastic cap.

Step A –

  Turn off the incoming water 

supply to the RO.

Step B –

  Open the RO Faucet and allow water to drain from the tank 

until it is completely empty.

  

  TIP: 

  When water from the RO faucet slows to a trickle, with the 

faucet still in the open position, you may add air to the tank 

to purge any left over water, this will ensure that the tank is 

completely empty. 

Step C –

  Once all water in the tank is purged, check air pressure 

using an air pressure gauge, it should read between 5 - 7 

PSI. (Digital air pressure gauge is recommended)

Step D –

  Follow startup procedure on page 7.

Step A –

  Turn off the water supply to your RO system at the 

Adapt-A-Valve™ and open the RO faucet to drain the 

storage tank. Once the storage tank is empty, remove all 

fi lter cartridges (order not important), place them into a 

sealed plastic bag and store in your refrigerator. 

NOTICE

Do Not Freeze!

To Restart your system

Step A –

  Reinstall the RO fi lters (per Page 8 - Annual Maintenance).

Step B –

  Follow the Startup Procedure (per Page 7). You will only 

need to fl ush the tank one time. 

NOTICE

If you have connected your RO system to a refrigerator / ice 

maker, make sure the ice maker is off (do not allow water 

to fl ow to the ice maker) until the tank has been allowed to 

completely fi ll.

TO REMOVE

SCHRADER

VALVE

IOM-Premier-RO-PURE.indd   9

7/10/20   2:32 PM

Содержание Premier RO-PURE

Страница 1: ...to a surface strong enough to support its weight System tested and certified by WQA against NSF ANSI Standard 58 for the reduction of the claims specified on the performance data sheet and to NSF ANSI...

Страница 2: ...ly reduced Stage 3 Membrane recommended change 2 5 years Stage three is the heart of the reverse osmosis system the 50GPD Gallons Per Day RO membrane This semi permeable membrane will effectively remo...

Страница 3: ...134018 1 4 QC x 1 4 FPT Tank Ball Valve 7 WP228173 Fitting 3 8 Stem x 1 4 QC Adapter 8 WP164056 Drain Saddle 3 8 Kit 9 WP610109 4 Green 1 4 Tubing 10 WP610113 4 Blue 1 4 Tubing 11 WP400048 3 Black 3 8...

Страница 4: ...itting With the collet held in this position the tube can be removed The fitting can then be reused STEP 1 NOTICE Water supply line to the system must be from the cold water supply line only Hot water...

Страница 5: ...faucet may push up out of position Prior to the install hold the faucet as shown in the picture and pull down on the wing nut This will ensure that the O rings are in their proper position and that y...

Страница 6: ...ough one side of the drain pipe Step C The drain saddle must be installed at least 1 above the nut of the P Trap elbow or cross bar from the garbage disposal to insure proper drainage Using the 3 8 dr...

Страница 7: ...en so it can easily be closed to prevent water flowing to the ice maker during start up and periodic maintenance An Ice maker Connection Kit can be purchased through Premier Startup NOTICE If your RO...

Страница 8: ...conditions and the amount the RO system is used This reverse osmosis membrane is critical for effective reduction of total dissolved solids TDS The product water should be tested periodically to verif...

Страница 9: ...es then continue rinsing eye Call a poison control center or doctor for treatment advice Check Air Pressure in the Tank Procedure for Extended Non Use More than 2 months NOTICE Check air pressure only...

Страница 10: ...water Set tank air pressure between 5 7psi See previous page Low Pressure in Tank Use a Digital Air Gauge for best results The empty tank pressure should be 5 7psi See Page 9 4 Noise Water from faucet...

Страница 11: ...S Total Dissolved Solids not to exceed 1800 ppm DESCRIPTION PART CHANGE TIME FRAME Sediment Pre Filter WP105311 6 Months Carbon Pre Filter WP105351 6 Months Final Carbon Filter WP105341 12 Months 50 G...

Страница 12: ...7 43 50 psi 0 1 11 1 mg L 0 5 NTU Nitrate Nitrite N A N A 83 30 N A N A N A N A N A Recovery 25 5 Daily Production Rate 23 5 GPD Efficiency 12 8 This system has been tested according to NSF ANSI 58 fo...

Страница 13: ...senic may not con vert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water utility contact the utility to find out if free chlorine or combined chlorine is us...

Страница 14: ...cord DATE OF PURCHASE MODEL NUMBER SERIAL NUMBER DATE OF INSTALL INSTALLED BY INSTALLED BY DATE SEDIMENT 6 MONTHS PRE CARBON 6 MONTHS POST CARBON 1 YEAR RO MEMBRANE 2 5 YEARS IOM Premier RO PURE indd...

Страница 15: ...ions from abuse misuse misapplication improper maintenance neglect alteration accidents casualties fire flood freezing environmental factors water pressure spikes or other such acts of God This warran...

Страница 16: ...IOM Premier RO PURE indd 16 7 10 20 2 32 PM...

Отзывы: