AM Series Boiler & Water Heater User Manual
CHAPTER 6: INSTALL
– VENT & COMBUSTION AIR PIPING
OMM-0100_E
•
GF-146
•
11/15/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 79 of 170
6.5.16 Multi-venting Sidewall Terminations
When two or more direct vent appliances are vented near each other, each appliance must be
individually vented and vent terminations may be installed as shown in Figure 6-10. It is
important that vent terminations be made as shown to avoid recirculation of flue gas.
Figure 6-10: Concentric Sidewall Multiple-Unit Termination Clearances