AM Series Boiler & Water Heater User Manual
CHAPTER 6: INSTALL
– VENT & COMBUSTION AIR PIPING
OMM-0100_E
•
GF-146
•
11/15/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 77 of 170
Figure 6-7: Two-Pipe Multi-Unit Air and Vent Sidewall Termination
6.5.14 Sidewall Termination
–
Concentric Vent
A concentric vent termination must terminate outside the structure and must be installed
as shown in Figure 6-8. The termination opening must be protected from rain, as shown in
Figure 6-9.
Figure 6-8: Concentric Sidewall Termination Clearances