Control Box and Cellular Gateway Installation
Prior to on-site installation, fill out and save the ACV Assure
Qualification Check List and ACV Assure Site Survey in the
Syncta Dashboard's Geo Location Detail Page.
• Mount in a good cellular signal area.
• Mount to a rigid structure.
• The Control Box should be installed vertical and upright as
shown at the field installation.
• The Control Box should be mounted 4 feet above the grade at
the field installation
• The Control Box should be prewired at the service provider’s
shop and tested.
• For pressure sensor installations, the pressure controller is
placed in the Control Box as shown in the above picture.
• Use the packaging foam to secure the Controller on both sides
against the Control Box. (not shown)
• Use the mounting feet which are included in the shipping box.
• Mount in a good Cellular signal area.
• Mount to a rigid structure.
• The Cellular Gateway should be installed vertical and upright as
shown at the field installation.
• The Cellular Gateway should be mounted above the Control Box.
• The Cellular Gateway should be prewired at the service provider’s
shop and tested.
• Use the mounting feet which are included in the shipping box.
Control Box with Field Wired Pressure Controller
Field Wired Cellular Gateway
Above Ground
ACV Installation
Below Ground
ACV Installation
4'-0"
8"
2'-
6"
12" #57 STONE
GRAVEL
BOTTOM
Storm Surge or
Flooding
WATTS Cellular Gateway
WATTS Hinged ACV
Relay Box w/Sensor
Controllers
48" X 48" HATCH
Flow Switch
(0.07 to 5 ft/s)
Pressure Sensor
(0 to 145psi)
PIPE SUPPORT
TYPE 2
6'-
0"
ACV
Installation Example