background image

4

ServiceGuide-ACV-Assure  

2133 

EDP# 1917123 

© 2021 Watts

Applications (Typical)

Pressure transducer installed in ground storage tank

Remote installation with solar panel for power

Vault with solar panel

Inside vault

Battery box with Cellular Gateway

Содержание ACV Assure

Страница 1: ...ications Typical 3 4 Control Box and Cellular Gateway Installation 5 Component Installation Details 6 Supplied Snubber Installation for the Pressure Sensor 6 Watertight Splice for the Pressure Transdu...

Страница 2: ...property damage or damage to the equipment This pictorial alerts you to the need to read the manual This pictorial alerts you to electricity electrocution and shock hazards Learn how to properly and...

Страница 3: ...ServiceGuide ACV Assure 2133 EDP 1917123 2021 Watts Applications Typical Solenoid Control Pressure Reducing ACV ACV Assure hardware installation on a 165 ft water tower base 165 ft Water Storage Towe...

Страница 4: ...ure 2133 EDP 1917123 2021 Watts Applications Typical Pressure transducer installed in ground storage tank Remote installation with solar panel for power Vault with solar panel Inside vault Battery box...

Страница 5: ...he packaging foam to secure the Controller on both sides against the Control Box not shown Use the mounting feet which are included in the shipping box Mount in a good Cellular signal area Mount to a...

Страница 6: ...e Flow Switch Connector Cable Pressure Sensor Teflon Tape Snubber Teflon Tape Component Installation Details Cellular Gateway Wiring Flow Switch Wiring Pressure Sensor installation must include the su...

Страница 7: ...essure Transducer When Control Cable Length Exceeds 9ft Crimp butt connector PVC red 22 18ga Tubing length is 1 to 1 from dimension X X 3 8 ID adhesive lined heat shrink tubing 3 to 1 ratio Place tubi...

Страница 8: ...roller 24VDC Power Supply 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conductor 18 20 AWG Control Cable 6 conductors 22 AWG PVC conductor insulation material for the Cellular Gateway Flow Switc...

Страница 9: ...VC conductor insulation material for the Cellular Gateway Flow Switch Pressure Controller 24VDC Power Supply To Solenoid 2 Conductor 18 20 AWG 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conduc...

Страница 10: ...Solenoid 2 Conductor 18 20 AWG 120 VAC 2 Conductor 18 20 AWG To Pressure Sensor 2 Conductor 18 20 AWG Relay Box Wiring for ACV Zone Control Control Cable 6 conductors 22 AWG PVC conductor insulation m...

Страница 11: ...ing for the Control Box 300V 22 AWG 4 To prevent water or dust from entering the Cellular Gateway Control Box Relay Box tighten all wiring glands 5 Apply power to the Control Box and Cellular Gateway...

Страница 12: ...uence When the Cellular Gateway powers up the device goes through a startup sequence Below is the startup sequence that the device will go through if everything is working correctly Operation This sec...

Страница 13: ...on to the cloud COLOR STATE DEFINITION SOLUTION Steady Blue There is a connection to the Watts Cloud N A Blinking There is not a connection to the Watts Cloud Trying to establish connection See No Con...

Страница 14: ...way and restart the device This will cause all ongoing operations to cease Note You can also perform a full reset by removing power to the Cellular Gateway for 10 seconds and then plugging it back in...

Страница 15: ...r other obstructions such as an electrical box Possible Cause 2 The location has poor cellular reception Solution 2 Move your Cellular Gateway to a different location and check to see that the CELLULA...

Страница 16: ...use If the Cellular Gateway is plugged in and the POWER LED is off the 24Vdc GND wiring polarity inside the Cellular Gateway might have been accidentally swapped Solution Use the instructions below to...

Страница 17: ...commissioning latch the Control Box cover closed and use the supplied tamper resistant screw and nut M4 x 16mm to secure the Control Box closed Assemble the cover and use 2 supplied tamper resistant...

Страница 18: ...ssets Register the Syncta device https app syncta com en connected onboarding welcome Log in to the Syncta account https app syncta com users sign_in already logged into your account go to https app s...

Страница 19: ..._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 20: ...product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circum...

Отзывы: