10 Start-up check list
l
Fit the pumphead to the drive. Refer to: 20 Pumphead Replacement on page 52.
l
Ensure the pumphead ports are securely fitted to the interface tubing.
l
Ensure proper connection has been made to a suitable power supply.
l
Ensure that the general recommendations are followed (see 8.1 General
recommendations on page 16).
m-qdos30-manual-11
19