Contents
Regulation installation and maintenance conditions
Installation of the outdoor unit
Positioning the hydraulic unit
Accessing the hydraulic module’s
Shaping the refrigeration pipes
Connecting the flared connections
Filling the installation with gas
Example of commissioning procedure
(Refrigerant collecting operation)
Filling and purging the installation
Connecting the Fan convector circuit
Heating circulation pump speed settings
Characteristic of the electrical supply
General remarks on electrical connections
Overview of all the electrical connections
Cable section and protection rating
Room thermostat and/or remote control
Configuring remote control (wireless)
"
This device requires for its installation, the intervention of qualified personnel with a certificate of
capacity for handling refrigerants
Installation and operating manual "1532 - EN"
Air to Water Heat Pump
- 2 -