WL200
Operating,
Installation,
and
Service
Manual
Page
19
‐
Revision:
4
‐
13
‐
2016
1.
Attach
the
water
supply
line
to
the
1/4”
feed
water
inlet
bulkhead
fitting
on
the
back
of
the
unit.
Waterlogic
requires
the
use
of
a
water
pressure
regulator.
Water
feed
pressure
must
be
between
40
‐
60
psi.
Turn
on
the
water
supply
and
check
for
leaks.
2.
Check
to
ensure
that
the
Red
Power
Switch
is
off.
O=OFF
3.
Connect
the
power
cord
to
the
back
of
the
Waterlogic
WL200
and
to
a
120
Volt
supply.
4.
Fill
the
Cold
Tank.
Hold
a
container
under
the
dispensing
faucet,
press
and
hold
the
main
dispensing
button
until
a
continuous
flow
of
water
is
obtained.
Once
a
continuous
flow
is
obtained,
release
the
dispensing
button.
Cold
tank
is
now
full.
5.
Move
the
Waterlogic
WL200
into
its
final
operating
position.
Be
sure
that
a
minimum
of
2”
clearance
is
maintained
around
both
the
sides
and
the
back
of
the
unit.
This
is
important
to
allow
proper
airflow
and
heat
exchange
of
refrigeration
system.
6.
Level
unit
using
the
adjustable
feet
to
level
if
necessary.
Never
install
on
incline.
7.
Turn
the
Red
Power
Switch
on.
I=ON
.
8.
When
the
unit
has
reached
its
Cold
Temp
Set
Point
Temperature,
the
compressor
will
cycle
off.
9.
Once
the
unit
is
at
the
target
temperature(s),
sample
the
water
to
ensure
water
meets
expectations
and
additional
rinsing
or
adjustment
is
not
required.
10.
Check
the
unit
for
any
leaks.
External
Leak
Protection
is
always
recommended.