STEP 1CS

 

CYCLE SEQUENCE

CYCLE SEQUENCE instructions allows the setting of the order of the
cycle. There are 9 cycles which can be arranged in any order.
Later in this book the INSTALLER SETTINGS allow the setting of how
long cycles will last.

END must be used as the last cycle option.  The SERVICE cycle should only be used in brine prefill applications.

If using upflow brine verify that the valve is configured as follows:
1.

upflow piston is installed; and

2.

injector is located in up hole and injector plug is in down hole.

The following is an example of how to set a valve so that when regeneration is initiated BACKWASH occurs first, dn
BRINE occurs second, RINSE occurs third, and FILL occurs fourth.

Step 1CS – Press NEXT and   simultaneously for 3 seconds until SOFTENING or
FILTERING appears on the display and release. If SOFTENING doesn’t appear, use the 
or 

 button to display it. Then press NEXT and   again for 3 seconds and release.  If

screen in Step 2CS does not appear in 5 seconds the lock on the valve is activated.  To
unlock press  , NEXT, 

, and SET CLOCK in sequence, then press NEXT and   simulta-

neously for 3 seconds and release.
Then press NEXT and   again for 3 seconds and release.

Step 2CS – Press the   or 

, buttons until BACKWASH appears.

Press NEXT to go to Step 3CS.
Press REGEN if you need to return to the previous step.

Step 3CS - Press the   or 

 buttons until dn BRINE appears.

Press NEXT to go to Step 4CS.
Press REGEN if you need to return to the previous step.

Step 4CS - Press the   or 

 buttons until RINSE appears.

Press NEXT to go to Step 5CS.
Press REGEN if you need to return to the previous step.

Step 5CS - Press the   or 

 buttons until FILL appears.

Press NEXT to go to Step 6CS.
Press REGEN if you need to return to the previous step.

Step 6CS - Press the   or 

 buttons until END appears.

Press NEXT to exit CYCLE SEQUENCE.
Press REGEN if you need to return to the previous step.

STEP 2CS

ß

STEP 3CS

ß

STEP 4CS

ß

STEP 5CS

ß

ß

STEP 6CS

ß

RETURN TO NORMAL MODE

ß

CYCLE OPTIONS

BACKWASH DN BRINE

FILL

END

RINSE

UP BRINE

SOFTENING

OR FILTERING

Содержание FUSION2 F Series

Страница 1: ...POSES AND TECHNICAL GUIDANCE IT IS STRONGLY RECOMMENDED THAT QUALIFIED DEALER SERVICE PERSONNEL BE CONTACTED IN THE EVENT OF AN UNKNOWN INTERRUPTION OF SERVICE OR APPARENT PRODUCT MALFUNCTION AN ANNUA...

Страница 2: ...NG DISPLAYS and RESETTING LOW SALT WARNING if applicable 3 Be sure CYCLE SEQUENCE SETTINGS and SOFTENER SYSTEM SETUP are done before leaving for installation 4 Follow INSTALLATION INSTRUCTIONS INSTALL...

Страница 3: ...bisulfite sodium hydrosulfite chlorine chloramines During operation the normal user displays such as time of day gallons or days remaining before regeneration optional and salt warning optional are sh...

Страница 4: ...gain for 3 seconds and release If screen in Step 2CS does not appear in 5 seconds the lock on the valve is activated To unlock press NEXT and SET CLOCK in sequence then press NEXT and simulta neously...

Страница 5: ...e previous step Step 6S Select the Lbs for the fourth cycle which in this example is FILL using the or button Press NEXT to go to Step 7S Press REGEN if you need to return to the previous step Step 7S...

Страница 6: ...d to be set because regeneration will always occ gallons capacity reaches 0 Any number On O oFF Reserve capacity not automatically estimated Regeneration occurs immediately when gallons capacity reach...

Страница 7: ...regeneration will occur at the preset time on O the regeneration will occur immediately when the gallons capacity reaches 0 zero NORMAL on 0 the regeneration will occur at one of the following the pr...

Страница 8: ...ing the regeneration cycle this position provides regeneration water to the unit while also providing untreated water to the distribution system See Figure 1 2 Bypass Position The inlet and outlet han...

Страница 9: ......

Страница 10: ...n connection on the control valve This will provide an adequate anti siphon trap Where the drain empties into an overhead sewer line a sink type trap must be used Run drain tube to its discharge point...

Страница 11: ...o previous step STEP 4I Next Regeneration Time hour Set the hour of day for regeneration using or buttons AM PM toggles after 12 The default time is 2 00 a m recommended This display will show REGEN o...

Страница 12: ...rd Softening or Filtering flashes on the display NORMAL OPERATING DISPLAYS or or REGEN TODAYwill Flash if a regeneration is expected Tonight REGENERATIONMODE Typically a system is set to regenerate at...

Страница 13: ...the SALT display alternates with the LBS REMAINING display Step 2US Press SET CLOCK Step 3US Set LBS REMAINING Use the or button to adjust the pounds remaining in the brine tank NOTE Estimate the poun...

Страница 14: ...eadily to the drain without the presence of air restore power and momentarily press the REGEN button to advance the control to the BRINE position 5 Fully open the inlet bypass valve handle bypass is n...

Страница 15: ...oard CC 1 5 V3110 Drive gear 12x36 3 6 V3109 Drive gear cover 1 2 6 V3002CC Drive assy CC not shown V3186 Transformer 110V 12V 1 Piston Assembly Item No Part No Description Qty 1 V3005 Spacer stack as...

Страница 16: ...RK BLUE V3010 1K K injector assy DARK GREEN not shown V3170 O ring 011 lower not shown V3171 O ring 013 upper The injector plug and the injector each use one lower and one upper o ring Note For a back...

Страница 17: ...sy NPT 1 5 V3163 O ring 019 1 6 V3159 01 DLFC Retainer assy 1 7 V3162 007 0 7 DLFC for elbow One DLFC must be used if fitting is used V3162 010 1 0 DLFC for elbow V3162 013 1 3 DLFC for elbow V3162 01...

Страница 18: ...adapter 1 1 5 V3163 O ring 019 1 6 V3150 Split ring 1 7 V3151 Nut 1 QC 1 8 V3105 O ring 215 1 9 V3190 065 6 5 gpm DLFC for 1 fitting One DLFC must be used if 1 fitting is used V3190 075 7 5 gpm DLFC f...

Страница 19: ...cription Qty 1 V3151 Nut 1 Quick Connect 2 2 V3150 Split ring 2 3 V3105 O ring 215 2 4 V3145 Bypass rotor 1 2 5 V3146 Bypass cap 2 6 V3147 Bypass handle 2 7 V3148 Bypass rotor seal retainer 2 8 V3152...

Страница 20: ...No V3007 2 req d Item No 4 Fitting only Part No V3149 2 req d Assembly Part No V3007 01 2 req d Item No 4 Fitting only Part No V3189 2 req d Description Fitting 1 Brass Sweat Assembly Assembly Part No...

Страница 21: ...notches To reassemble seat the bottom of the drive bracket so the notches are engaged at the bottom of the drive back plate Push the top of the drive bracket towards the two latches The drive bracket...

Страница 22: ...position DRIVE CAPASSEMBLY MAIN PISTONAND REGENERANT PISTON The drive assembly must be removed to access the drive cap assembly The drive cap assembly must be removed to access the piston s The drive...

Страница 23: ...s and red or clear lip seals for wear or damage Replace the entire stack if necessary The spacer stack assembly has been 100 tested at the factory to insure proper orientation of one way seals Do not...

Страница 24: ...need to be removed from the PC board if the water meter is only being inspected and cleaned To remove the water meter assembly unscrew the meter cap on the left side of the control valve Pliers may b...

Страница 25: ...Rotating the assembly as you pull it out will enable it to be removed more easily There are three o rings one under the rotor cap one on the rotor stem and one on the rotor seal Replace worn o rings C...

Страница 26: ...f regeneration d Contol set at on 0 d Check with regen time option in programming e Control set at NORMAL on 0 e Check with regen time option in programming 5 ERROR followed by a code number ERROR cod...

Страница 27: ...r unplugged a Connect transformer and PC boar power b No power at outlet b Restore power c Broken drive gear or drive cap assembly c Replace gear or drive cap assemb d Defective PC board d Replace boa...

Отзывы: