Use the pre-treatment summary below to prescribe the necessary pre-treatment where your water 

analysis indicates parameters outside of the recommended range: 

Pre-Treatment Summary Chart 

Recommended 

Feed Water 

Range  

Potential 

Effect 

Pre-Treatment Solution 

Waterite 

Models 

TDS 

< 3000 ppm 

Reduced production rate 

Increased salt passage 

Replace water source 

Call your 

dealer 

T. Hardness 

< 6 grains/gal 

(103 mg/l) 

Scaling of membrane surface 

Reduced production rate 

Automatic Softener 

 

 

 

 

Anti-Scalant Feed 

System 

A Series 

Fusion² 

Magnum 

RS Series 

 

 

Contact 

Your 

Waterite 

Dealer

 

Total Iron 

< .05 ppm 

Reduced production rate 

Fouling of membrane surface 

Iron deposits in equipment 

Iron Remover (> 5 ppm) 

Softener (levels < 5 ppm) 

Paterson 

I.R. 

Premier 

Magnum  

Tannins  

< .5 ppm 

Reduced production rate 

Fouling of membrane surface 

Softener with organic 

scavenger resin 

A Series 

Fusion² 

RS series 

Magnum 

Chlorine 

< .1 ppm 

Permanent membrane 

damage 

Increased salt passage 

Carbon Filter 

CF Series 

Excelclear 

Carbon 

pH 

5.5 – 9.5 

Internal corrosion 

Lime scaling in equipment 

Plumbing damage 

Replace water source 

Adjust pH 

Call your 

dealer 

Organic or 

Microbiological 

Activity 

Reduced production rate 

Fouling of membrane surface 

Sliming of pre-treatment 

equipment, odour 

UV Disinfection followed 

by 1-micron filtration 

Well chlorination 

Excelight 

UV 

Systems 

WellPro  

 

Manganese 

<. 05 ppm 

 

 

Reduced production rate 

Fouling of membrane surface 

Manganese Greensand 

Filter 

MG Series 

MT Series 

Hydrogen 

Sulphide 

“Rotten egg” odour 

Internal corrosion 

Iron Remover (<1 ppm) 

Manganese Greensand 

Filter (> 1 ppm) 

Paterson 

I.R. 

MG Series  

Turbidity 

SDI < 5.0 

Reduced production rate 

Plugging of membrane  

Rotary vane pump damage 

Multimedia Filter 

Pre-treatment cartridges 

MF Series 

 Excelpure 

Содержание BLACKMAXX RB8

Страница 1: ...T FOR REFERENCE PURPOSES AND TECHNICAL GUIDANCE IT IS STRONGLY RECOMMENDED THAT QUALIFIED DEALER SERVICE PERSONNEL BE CONTACTED IN THE EVENT OF AN UNKNOWN INTERRUPTION OF SERVICE OR APPARENT PRODUCT M...

Страница 2: ...molecules are allowed to pass through and collect in the tube while all other mineral and contaminant molecules are rejected and washed from the surface of the membrane to the drain Q What processes...

Страница 3: ...low energy membrane s that are designed to operate at a minimum system pressure of 100 psi 7 0 kg cm and a maximum of 250 psi depending on the model 17 6kg cm Do not attempt to operate your system at...

Страница 4: ...e are highly accurate instruments that have 4 20ma outputs for recording and alarm purposes Calibration of the sensors should be done twice a year Membrane cleaning is a site specific operation Depend...

Страница 5: ...treated to levels 5 mg l to avoid membrane fouling This is usually achieved through the use of organic scavenging ion exchange resin polystyrene or polyacrylic regenerated with salt Chlorine Feed wat...

Страница 6: ...requires The importance of feed water conditions is evident when you examine how crossflow membranes work In simple terms a crossflow filtration system separates an influent stream into two effluent s...

Страница 7: ...ion rate Fouling of membrane surface Softener with organic scavenger resin A Series Fusion RS series Magnum Chlorine 1 ppm Permanent membrane damage Increased salt passage Carbon Filter CF Series Exce...

Страница 8: ...3 3 M3 d RB840K 40000GPD 27 7 USGPM 104 4 LPM 1 6 L s 151 4 M3 d RB860K 60000GPD 41 5 USGPM 156 6 LPM 2 51L s 227 1 M3 d RB880K 80000GPD 55 4USGPM 209 LPM 3 3 L s 302 8 M3 d RB8100K 100000GPD 69 4 USG...

Страница 9: ...RO chemical disinfection is not being used If the permeate is to remain in the tank for a period of more than 1 day without a disinfection residual being added a recirculation loop with a UV disinfec...

Страница 10: ...requirements The RB8 system use a dual voltage configuration to minimize power consumption The system controls are run on a 120 vac 1 amp and the following are ratings for the motors at 230 208 vac 3...

Страница 11: ...re 2b External Electrical Cabinet Motor power 3 PH disconnect Motor starter Flush valve relay Field connection terminals 120vac 24vdc Transformer Main control board 120vac 120 vac control power Manual...

Страница 12: ...n and is capable of delivering the system s necessary feed water flow rate See below for specified feed water flow rate requirements 2 Turn the water supply line to your plumbing OFF Plumb a connectio...

Страница 13: ...um flow requirements on full flow parameters Inlet feed rates will vary with projected system recovery rates Use the following formula to size flow rates according to your specifications Recovery Rate...

Страница 14: ...permeate line should be used Hard plumbing is recommended with either a 304 316 Stainless Steel or PVC line DO NOT USE BLACK IRON PIPE TO CONNECT PERMEATE LINE OR FEEDWATER LINE TO SYSTEM Connect the...

Страница 15: ...olution to sterilize them This can help to prevent any bacteria from contaminating the membranes product core See Figure 5 for membrane housing assembly Disconnect the power and turn off the feed wate...

Страница 16: ...e lines Ensure the gaskets are in good repair Replace if necessary Turn power and water back on Start unit Fix any leaks 3 7 3 Membrane removal To remove the membrane from the housing remove the end c...

Страница 17: ...point Allow the feed water to fill slowly into the system This process will expedite the air removal from the RO system Once the water starts to run out of the system to drain close the auto flush va...

Страница 18: ...ce after about 48 to 72 hours of operation You should develop a daily log to track line pressure system pressure feed water TDS permeate TDS permeate flow rate and waste flow rate This will allow you...

Страница 19: ...s kit This is needed to claim any parts or repair service during the warranty period Read the document completely for warranty claim instructions Your RB8 BlackMaxx system comes with a limited one yea...

Страница 20: ...to tightening Replace gasket Threaded fittings leaking Disassemble remove old Teflon tape apply new tape re assemble Pre filter housing leaking Tighten clamp handle Remove cap and Inspect o rings for...

Страница 21: ...nk full Drain Tank start in auto mode Low inlet pressure Check pre treatment system water quality Inlet valve closed System in alarm Check alarm status Pumps cavitating See low feed pressure System of...

Страница 22: ...onductivity Probe ROSCOND VALVES Part Description Part 1 0 SS Globe Valve 20 30 40K AK200UJM100 1 25 SS Globe Valve 60 80K AK200UJM125 1 5 SS Globe Valve 100 120K AK200UJM150 1 00 Check Valve Poppet S...

Страница 23: ...23 Section 9 RB8 BLACKMAXX Performance Log Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Страница 24: ...24 Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Страница 25: ...llowing is meant as a guide for determining the output of your BlackMaxx RB8 system Locate your model number and then look for the approximate temperature of your feed water This will give the estimat...

Страница 26: ......

Отзывы: