background image

14

 

ALWAYS MAINTAIN OR INSTALL A 2” AIR GAP ON ALL DRAIN LINES TO 

PREVENT SEWAGE BACK SIPHONAGE. 

 

Fig. 3b Back view 

 

3.5 Installing the drain line 

 

A line size equal to or larger than your system’s drain line should be used. Attach the drain 

line to the waste connection on the back of your RB8.  Position the drain line over the drain 

and secure it in place.  Do not elevate the drain line over 10 feet above the unit.  If connection 

to a sewer line is necessary, check the local code or a plumbing professional for guidance 

and the required parts.  Usually a trap with a 2” air gap will suffice. 

 

 

 

 

 

 

 

3.6 Installing the permeate lines 

 

Connect to the permeate-out line, located on the back upper left of the frame. A Line size 

equal to or larger than your system’s permeate line should be used.   Hard plumbing is 

recommended with either a 304/316 Stainless Steel or PVC line.  

DO NOT USE BLACK 

IRON PIPE TO CONNECT PERMEATE LINE OR FEEDWATER LINE TO SYSTEM.

  

Connect the permeate Low TDS line, either to your process or to a storage tank, ensuring 

that a 2” air gap is maintained between the outlet of the line and the tanks overflow level.  

When connecting directly to a process line, a SST backflow preventer should be included.  If 

a height of more than 10 ft is required to connect to the process or storage, a check valve 

should be placed between the permeate connection and the process/storage,  to prevent 

excess back pressure on the permeate core of the membranes. 

 

 

 

Auto Flush Valve 

 

CIP Outlet

 

Waste Control Valve 

 

CIP

 

Inlet 

 

Permeate Flow Sensor

 

Permeate Control Valve 

 

Permeate Hi TDS 

Divert Connection

 

Permeate Low TDS To 

Storage Connection

 

Waste Connection 

 

Waste Flow Sensor

 

Permeate Sample Port 

 

Permeate TDS Sensor 

 

Содержание BLACKMAXX RB8

Страница 1: ...T FOR REFERENCE PURPOSES AND TECHNICAL GUIDANCE IT IS STRONGLY RECOMMENDED THAT QUALIFIED DEALER SERVICE PERSONNEL BE CONTACTED IN THE EVENT OF AN UNKNOWN INTERRUPTION OF SERVICE OR APPARENT PRODUCT M...

Страница 2: ...molecules are allowed to pass through and collect in the tube while all other mineral and contaminant molecules are rejected and washed from the surface of the membrane to the drain Q What processes...

Страница 3: ...low energy membrane s that are designed to operate at a minimum system pressure of 100 psi 7 0 kg cm and a maximum of 250 psi depending on the model 17 6kg cm Do not attempt to operate your system at...

Страница 4: ...e are highly accurate instruments that have 4 20ma outputs for recording and alarm purposes Calibration of the sensors should be done twice a year Membrane cleaning is a site specific operation Depend...

Страница 5: ...treated to levels 5 mg l to avoid membrane fouling This is usually achieved through the use of organic scavenging ion exchange resin polystyrene or polyacrylic regenerated with salt Chlorine Feed wat...

Страница 6: ...requires The importance of feed water conditions is evident when you examine how crossflow membranes work In simple terms a crossflow filtration system separates an influent stream into two effluent s...

Страница 7: ...ion rate Fouling of membrane surface Softener with organic scavenger resin A Series Fusion RS series Magnum Chlorine 1 ppm Permanent membrane damage Increased salt passage Carbon Filter CF Series Exce...

Страница 8: ...3 3 M3 d RB840K 40000GPD 27 7 USGPM 104 4 LPM 1 6 L s 151 4 M3 d RB860K 60000GPD 41 5 USGPM 156 6 LPM 2 51L s 227 1 M3 d RB880K 80000GPD 55 4USGPM 209 LPM 3 3 L s 302 8 M3 d RB8100K 100000GPD 69 4 USG...

Страница 9: ...RO chemical disinfection is not being used If the permeate is to remain in the tank for a period of more than 1 day without a disinfection residual being added a recirculation loop with a UV disinfec...

Страница 10: ...requirements The RB8 system use a dual voltage configuration to minimize power consumption The system controls are run on a 120 vac 1 amp and the following are ratings for the motors at 230 208 vac 3...

Страница 11: ...re 2b External Electrical Cabinet Motor power 3 PH disconnect Motor starter Flush valve relay Field connection terminals 120vac 24vdc Transformer Main control board 120vac 120 vac control power Manual...

Страница 12: ...n and is capable of delivering the system s necessary feed water flow rate See below for specified feed water flow rate requirements 2 Turn the water supply line to your plumbing OFF Plumb a connectio...

Страница 13: ...um flow requirements on full flow parameters Inlet feed rates will vary with projected system recovery rates Use the following formula to size flow rates according to your specifications Recovery Rate...

Страница 14: ...permeate line should be used Hard plumbing is recommended with either a 304 316 Stainless Steel or PVC line DO NOT USE BLACK IRON PIPE TO CONNECT PERMEATE LINE OR FEEDWATER LINE TO SYSTEM Connect the...

Страница 15: ...olution to sterilize them This can help to prevent any bacteria from contaminating the membranes product core See Figure 5 for membrane housing assembly Disconnect the power and turn off the feed wate...

Страница 16: ...e lines Ensure the gaskets are in good repair Replace if necessary Turn power and water back on Start unit Fix any leaks 3 7 3 Membrane removal To remove the membrane from the housing remove the end c...

Страница 17: ...point Allow the feed water to fill slowly into the system This process will expedite the air removal from the RO system Once the water starts to run out of the system to drain close the auto flush va...

Страница 18: ...ce after about 48 to 72 hours of operation You should develop a daily log to track line pressure system pressure feed water TDS permeate TDS permeate flow rate and waste flow rate This will allow you...

Страница 19: ...s kit This is needed to claim any parts or repair service during the warranty period Read the document completely for warranty claim instructions Your RB8 BlackMaxx system comes with a limited one yea...

Страница 20: ...to tightening Replace gasket Threaded fittings leaking Disassemble remove old Teflon tape apply new tape re assemble Pre filter housing leaking Tighten clamp handle Remove cap and Inspect o rings for...

Страница 21: ...nk full Drain Tank start in auto mode Low inlet pressure Check pre treatment system water quality Inlet valve closed System in alarm Check alarm status Pumps cavitating See low feed pressure System of...

Страница 22: ...onductivity Probe ROSCOND VALVES Part Description Part 1 0 SS Globe Valve 20 30 40K AK200UJM100 1 25 SS Globe Valve 60 80K AK200UJM125 1 5 SS Globe Valve 100 120K AK200UJM150 1 00 Check Valve Poppet S...

Страница 23: ...23 Section 9 RB8 BLACKMAXX Performance Log Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Страница 24: ...24 Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Страница 25: ...llowing is meant as a guide for determining the output of your BlackMaxx RB8 system Locate your model number and then look for the approximate temperature of your feed water This will give the estimat...

Страница 26: ......

Отзывы: