background image

ON 100 Odour Neutraliser

TECHNICAL & OPERATION MANUAL

ON 100 operation instructions:Layout 1  9/5/10  12:44  Page 1

Summary of Contents for ON 100

Page 1: ...ON 100 Odour Neutraliser TECHNICAL OPERATION MANUAL ON 100 operation instructions Layout 1 9 5 10 12 44 Page 1 ...

Page 2: ...reby expressly reserved The instructions in this publication only serve as a guideline for installation use maintenance and repair of the product mentioned on the cover page of this document This publication is to be used for the standard model of the product of the type given on the cover page Thus the manufacturer cannot be held responsible for any damage resulting from the application of this p...

Page 3: ... the product mentioned on the cover of this document or corresponding accessories Specific working conditions or used accessories may require additional safety instructions Immediately contact your supplier if you detect a potential danger when using the product The user of the product is always fully responsible for observing the local safety instructions and regulations Observe all applicable sa...

Page 4: ...e product is not allowed Use general Inspect the product and check it for damage Verify the functioning of the safety features Check the working environment Do not allow unauthorised persons to enter the working environment Use common sense Stay alert and pay attention to your work Do not use the product when you are tired or under the influence of drugs alcohol or medicine Make sure the room is a...

Page 5: ... Do not carry out any service maintenance or repairs on the product before it has been protected against unintended starting Safety features removed for servicing maintenance or repair shall be re installed immediately and checked for proper functioning Regularly clean the inside of the housing Clean or replace the filters in time USED PRODUCTS AND THE ENVIRONMENT Packaging Material The purpose of...

Page 6: ...ixed with the specially blended neatralising chemical Eliminodor A vapour is formed which is then ionised to a negative potential of 15 000 V The ionised vapor passes along a nonconductive tube and is discharged into the centre of the duct via a venturi spigot the metal ducting is earthed through the same high tension circuit which makes the contaminant at an opposite potential to the negatively c...

Page 7: ...s into the internal box It is secured in place by screwing the flange attached to the damper to the case of the unit Once the unit is in position and connected electrically test the operation prior to completion of the installation On the inside of the unit you will see a small knob which is the speed controller for the fan used to agitate the neutralising fluid in the chamber Turn the fan speed t...

Page 8: ...en two clips over the bottom connection and one over the spigot connection Be sure not to over tighten the clips as this will crack the pipe 3 2 Commissioning O N 100 Now that the system is fully installed turn the fan to maximum and open the damper fully Neutralising fluid should now be strongly detected at the exhaust point To balance the system correctly wait until the kitchen is busy neutralis...

Page 9: ... E levation Plan 600 ServiceSpace Note If accessequipment isnecessary servicerequirementsmayvary Service Space Note If access equipment is necessary service requirements may vary Air flow Air flow Ductwork ON 100 ON 100 ON 100 Ductwork Plan Front Elevation Side Elevation ON 100 operation instructions Layout 1 9 5 10 12 44 Page 9 ...

Page 10: ... the unit remove the filler cap and pour in the liquid The level of liquid required to ensure optimum performance is between the minimum and maximum lines on the site glass Caution Over filling the unit may lead to damage Once the unit has been filled replace the filler cap and return the fan speed control to its previous position ONLY USE PURIFIED AIR ELIMINODOR AND NEVER ALLOW THE SYSTEM TO RUN ...

Page 11: ...ON 100 operation instructions Layout 1 9 5 10 12 44 Page 11 ...

Page 12: ...d Air Limited Lyon House Lyon Road Romford Essex RM1 2BG England Tel 01708 755414 Fax 01708 721488 E mail enq purifiedair co uk www purifiedair co uk ON 100 operation instructions Layout 1 9 5 10 12 44 Page 12 ...

Reviews: