WS1HR & WS1.25HR Manual
Page 15
OEM Cycle Sequence
OEM Cycle Sequence instructions allows the OEM to set the
order of the cycle. The OEM Softener System Setup or the OEM
Filter System Setup allow the OEM to set how long cycles will
last. The OEM may choose up to 9 cycles in any order.
END must be used as the last cycle option. The SERVICE
cycle should only be used in brine prefi ll applications. See Tables
3 and 4 for examples of typical softener or fi lter cycle sequences.
Prior to selecting dn brine or uP brine or not selecting a regenerant fl ow cycle, verify the correct valve body, main piston, regenerant
piston, and stack are being used, and that the injector or injector plug(s) are in the correct locations. See Compliance Table in
Service Instructions under Injector Cap, Screen, Injector Plug and Injector section and Figure 6.
The following is an example of how to set a valve so that when regeneration is initiated BACKWASH occurs fi rst, dn BRINE occurs
second, RINSE occurs third, and FILL occurs fourth.
Step 1CS – Press NEXT and
▼
simultaneously for 3 seconds and release. Then press NEXT and
▼
simultaneously for 3 seconds and release. If screen in Step 2CS does not appear in 5 seconds the lock
on the valve is activated. To unlock press
▼
, NEXT,
▲
, and CLOCK in sequence, then press NEXT and
▼
simultaneously for 3 seconds and release. Then press NEXT and
▼
simultaneously for 3 seconds and
release.
Cycle Options
BACKWASH
DN BRINE
FILL
END
RINSE
UP BRINE
(WS1HR Only)
SOFTENING
OR FILTERING
STEP 1CS
➟
➟
Step 2CS – Use the
▲
or
▼
to select 1.0 for 1” valve or 1.25 for 1.25” valve. Press NEXT to go to Step
3CS. Press REGEN to exit OEM Cycle Sequence.
STEP 2CS
Step 3CS – Allows selection of one of the following:
• an outside signal to initiate a regeneration;
• the Control Valve to act as an alternator; or
• the Control Valve to have no hard water bypass.
Selecting the use of an outside signal to initiate a regeneration:
Selection only matters if a connection is made to the two pin connector labeled DP SWITCH located on
the printed circuit board. Following is an explanation of the options:
dPon0 - If the dP switch is closed for an accumulative time of 2 minutes a regeneration will occur im-
mediately.
dPdEL - If the dP switch is closed for an accumulative time of 2 minutes a regeneration will occur at the
scheduled regeneration time.
HoLd - If the dP switch is closed a regeneration will be prevented from occurring.
Selecting the Control Valve to act as an alternator:
Note: Also must do one of the following:
• If set up for a softener in Step 8S set Volume Capacity in GALLONS, in Step 9S select Regenera-
tion Time Option “on 0” and in Step 3I select Day Override “oFF”.
• If set up for a fi lter, in Step 7F set Volume Capacity in GALLONS, in Step 8F select Regeneration
Time Option “on 0” and in Step 3I select Day Override “oFF”.
Select ALTA for the control valve that has the two pin connector labeled DRIVE connected to the alter-
nator valve motor.
Select ALTb for the control valve that will not be connected to the alternator valve motor.
Confi guring the Control Valve for No Hard Water Bypass Operation:
Selection requires a connection to a Clack Two Way Motorized Valve or a Clack Motorized Alternator
Valve (MAV) is made to the two pin connector labeled ALTERNATOR DRIVE located on the printed
circuit board. The Clack Two Way Motorized Valve can be connected to the valve outlet in either
direction. The B port of a MAV must be plugged and the valve outlet connected to the A port. The Clack
Two Way Motorized Valve or a Clack Motorized Alternator Valve will be driven closed before the fi rst
regeneration cycle that is not FILL or SOFTENING or FILTERING, and be driven open after the last
regeneration cycle that is not FILL.
Press NEXT to go to Step 4CS. Press REGEN to return to previous step.
STEP 3CS
Содержание WS1HR
Страница 2: ......
Страница 13: ...WS1HR WS1 25HR Manual Page 13 Figure 3 Figure 4 Figure 1 Figure 2...
Страница 30: ...Page 30 WS1HR WS1 25HR Manual Drawings and Part Numbers...
Страница 42: ...Page 42 WS1HR WS1 25HR Manual Flow Diagrams Service and Backwash...
Страница 43: ...WS1HR WS1 25HR Manual Page 43 Flow Diagrams Downflow and Upflow WS1HR Only...
Страница 44: ...Page 44 WS1HR WS1 25HR Manual Flow Diagrams Rinse and Fill...
Страница 54: ...Page 54 WS1HR WS1 25HR Manual...
Страница 55: ...WS1HR WS1 25HR Manual Page 55...
Страница 56: ...Page 56 WS1HR WS1 25HR Manual...
Страница 57: ...WS1HR WS1 25HR Manual Page 57...
Страница 58: ...Page 58 WS1HR WS1 25HR Manual...
Страница 59: ...WS1HR WS1 25HR Manual Page 59...