background image

User programming (Cont’d) 

Start-up procedure 

Control programming is now complete. Press the extra cycle button, and the control 
will from the programming mode and resume normal operation. 

Sanitization of unit:  

After complete installation of unit, dilute 1/2 cup of unscented laundry 

bleach in 3 gallons of water, and add to brine tank. Initiate a manual regeneration by         
depressing the extra cycle button. Allow the unit to complete its cycle and advance to the 
“Service” position. The unit is now sanitized and ready for operation. 

3. Adjust Regeneration Time: 

Press the Extra Cycle button. This setting determines the 

time of day that the unit will enter the regeneration cycle. The most common / default set-
ting is 2:00 AM.  

4. Set Water Hardness: 

Press the Extra Cycle button. Set the hardness of the incoming wa-

ter. For each PPM of iron, add 4 GPG to this setting. This will determine the amount of wa-
ter conditioned between regeneration cycles. 

5. Set Fixed Reserve Capacity : 

Press the Extra Cycle button. Set the Fixed reserve capac-

ity for the household. This is the amount of water needed in reserve to reach the delayed 
regeneration time. Standard setting is 50 gallons per person in the household. 

Содержание BrassMaster plus+

Страница 1: ...Metered Water Softener Installation Operation manual Manufactured by Water Control Corporation 7150 143rd Ave NW Ramsey MN 55303 Tel 763 427 9635 Fax 763 427 5665...

Страница 2: ...rn into the female threaded opening on the back side of the control valve Connect 5 8 drain line supplied in parts bag to barbed end of drain line fitting and run to a nearby drain Be sure not to subm...

Страница 3: ...5 minutes manually index the valve through the remaining cycles as follows Push the extra cycle button once to advance the valve to regen step 2 Push the extra cycle button once to advance the valve t...

Страница 4: ...between regen eration cycles System will regenerate regardless of usage if the days since last regeneration cycle equals the day override setting This insures regular regeneration periods In areas of...

Страница 5: ...tized and ready for operation 3 Adjust Regeneration Time Press the Extra Cycle button This setting determines the time of day that the unit will enter the regeneration cycle The most common default se...

Страница 6: ...s in Placing unit into service to step valve through all 4 cycles but do not open bypass valve When this procedure is performed with the bypass closed it will relieve any water pressure on the unit Re...

Страница 7: ...IMS ANY AND ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE WHAT IS NOT COVERED BY THESE WARRANTIES 1 Conditions and damages re...

Страница 8: ...Manufactured by Water Control Corporation 7150 143rd Ave NW Ramsey MN 55303 Tel 763 427 9635 Fax 763 427 5665...

Отзывы: