14
Once the mortar bed has set, dry fit
the TempZone™ Shower Mat to verify
its dimensions and ensure it fits the
contours of the shower area.
Conduct insulation & resistance tests.
Record readings on the warranty
card found inside the TempZone™
Installation instructions.
Attach the mat to the subfloor using
hot glue.Prepare the latex-modified
thinset. Using a flat trowel, spread a
coat of thinset over the installed mat.
For best results, we recommend a
1” maximum distance between the
heating cable and the top of the tile.
Please ensure the slope of the mortar
bed is maintained to direct water
toward the shower drain.
Allow the thinset mortar to set.
Conduct resistance tests and record
readings on warranty cards.
Using a hot glue gun, secure the cold
lead to the mortar bed and over the
shower curb. In order to minimize
tension on the cold lead, use an
“S” formation to bring the cold lead
over the shower curb. Do not allow
the tip of the hot glue gun to touch
the cold lead as it may damage the
TempZone™ Shower Mat.
Direct the supply lead to the electrical
panel box.
Install a secondary waterproofing
membrane in accordance with the
membrane manufacturer’s installation
instructions.
A secondary waterproofing membrane
will protect the mortar bed from any
moisture that may seep through the
tile, which could cause mold problems
over time
Install tile flooring according to the tile
manufacturer’s instructions. Conduct
insulation & resistance tests and
record the values on the warramty
card..