background image

 

Glue Down Laminate & Engineered Wood Floors - Installation Guide

12

Materials  

and Tools Required: 

• WarmlyYours TempZone™ Heating Rolls 
• Thermostat with Sensor Probe Wire
• Custom Design Layout (provided free with quote)
• Digital Ohm Meter (required for completion of warranty registration card)
• Circuit Check (sold separately)
• Scissors
• Staple Gun or Hot Glue Gun (concrete applications)
• Duct Tape or Box Tape
• Latex-Portland Cement (acrylic or latex modified thin-set mortar) 
• Plastic Notched Trowel
• Flat Rubber Trowel (float trowel)
• Self-leveling Cement 
•  ¼” Cork or 3/16” CeraZorb® concrete insulating underlayment (WarmlyYours offers 

both of these products), or similar, is recommended when installing over concrete. 

This is recommended to increase efficiency, but is not mandatory.

For best results, we recommend a 1”- 1.5” maximum distance between the 

heating cable and the top of the floor. 

 

See Thermal Insulating & Sound Control Underlayment installation 

instructions

. We do not recommend using self-leveling cement directly over cork 

insulating underlayment. However, self-leveling cement can be used directly over 

CeraZorb® insulating underlayment.

Preparation:

1.  Cross-check the items received against the packing list and the materials list on 

the installation plan to ensure that the roll length and thermostat type are an exact 

match.

2.  Perform 1st ohm test - Measure the resistance of each mat with an Ohm meter 

(reading core wire to core wire) and record the readings on the UL label and on 

the installation plan. The Ohms readings should be within a +/- 15% variance of 

the Ohm value specified on the UL tag. Measure the continuity between core wire 

and ground wire – The reading should be O/L or infinity.

3. Prepare the subfloor to be clean and free of debris.
4.  Do a dry fit of the rolls on the subfloor according to the custom design/installation 

plan. Measure and mark the mats and subfloor if necessary.

5. Make any adjustment in the layout PRIOR to cutting the roll. 
6.  When using Self-Leveling Underlayment (SLU), we suggest priming the floor 

before laying out the rolls. Doing so will ensure that the primer covers the 

subfloor completely. Whenever using SLU, ALWAYS follow the installation 

recommendations set forth by the SLU’s manaufacturer. It is very important to 

adhere the heating roll securely to the subfloor, otherwise the heating wire may 

float to the top of the SLU.

Please call WarmlyYours at (800) 875-5285 if the roll does not provide the specified 

coverage or for 24/7 installation and technical support.

Concrete Subfloor Applications:

Prepare the subfloor as per flooring manufacturer recommendations.  In some cases, 

leveling of the subfloor may be necessary. Leveling should be done before installing 

heating rolls. Insulating over concrete slab: Adhere the ¼” cork or 3/16” CeraZorb® 

insulating underlayment to the concrete with latex-portland cement using a 1/8” 

v-notched trowel. 

NOTE

: Self-leveling cement cannot be poured directly over cork insulating 

underlayment. 

For applications where self-leveling cement must go directly over the concrete 

insulator, we recommend using CeraZorb® insulating underlayment.

Содержание TempZone

Страница 1: ...1 1 Free Design Service 24 7 Installation Support No Nonsense Warranty 800 875 5285 www WarmlyYours com Installation Manual for your TempZone Electric Radiant Floor Heating System Twin Conductor...

Страница 2: ...ted surface temperatures and lower energy usage The floor will have the capacity to warm to a comfortable temperature and in some cases can be employed as the primary heat source for that room Securin...

Страница 3: ...Electrical Housing Boxes Switch Plates All control devices except a Relay Contactor fit into a double gang box If a double gang box is used it will need to be fitted with a single gang mud ring We str...

Страница 4: ...to continue in a new direction See Page 5 for full details on how to execute turns F Free Form Space Indicates a length of Fiberglass Mesh that needs to be removed and separated from the Heating Eleme...

Страница 5: ...re a Relay Contactor or Power Module s in addition to the control device to operate properly The Relay or the Power Modules may be located in the same vicinity as the control device If your system wil...

Страница 6: ...is indicated on the Installation Plan by an arc with an arrowhead By examining the relationship between two panels you will determine the type of turn needed Free Form Free form spaces are filled with...

Страница 7: ...Mesh sits on top of the Heating Element Working around Obstacles Special circumstances will require the Heating Element to circumvent an obstacle The released Heating Element is not needed to fill an...

Страница 8: ...hold the wires onto the probes with your fingers A digital meter is easier to use and strongly recommended It is wise to verify that the batteries of the Ohmmeter are good Set your Ohmmeter to measur...

Страница 9: ...lack Red Copper Ground Black Lead THERMOSTAT 1 2 3 4 5 C O INDIA Made by Thermopads Pvt Ltd for WarmlyYours com Inc ENREGISTRE LISTED C US RADIANT HEATING PANEL UNIT UNITE DE PLANCHER CHAUFFANT ELECTR...

Страница 10: ...the Mudbed in the thin set used to adhere the tiles It is advised to prepare the subfloor as you would for any conventional installation along the Tile Council of America Guidelines Once installed ove...

Страница 11: ...suitable glue or cement based adhesive or thinset mortar to adhere it to the slab If installing in a wet location ensure the slope of the mortar bed is maintained to direct water to the drain pipe Not...

Страница 12: ...henever possible 2 Set tiles as recommended TIP Remove excess thin set that may ooze up between the grout joints with a wet rag toothbrush or sponge while installing the tile in preparation for a clea...

Страница 13: ...n the UL label and on the installation plan The Ohms readings should be within a 15 variance of the Ohm value specified on the UL tag Measure the continuity between core wire and ground wire The readi...

Страница 14: ...ply the Flooring Adhesive glue 1 Apply manufacturer s recommended adhesive as per flooring installation instructions Install Laminate Engineered Wood Flooring 1 Install laminate or engineered wood flo...

Страница 15: ...anty cards Using a hot glue gun secure the cold lead to the mortar bed and over the shower curb In order to minimize tension on the cold lead use an S formation to bring the cold lead over the shower...

Страница 16: ...Ohm resistance of each roll should be measured across the core wires Make sure the probes of the Ohm meter do not touch the sheath wire Make sure you do not touch either of the probe ends with your fi...

Страница 17: ...If a sensor is used indicate its location on the plan The electrician should put the code labels UL from any Heating Roll used in a convenient place such as the circuit breaker box The labels should h...

Страница 18: ...must be electrically grounded and protected by a GFI Ground Fault Interrupter 4 The installation must comply with all national and local electrical and building codes as well as any other applicable...

Страница 19: ...INESS REPLY MAIL FIRST CLASS MAIL PERMIT NO 77 LONG GROVE IL WarmlyYours Inc 590 Telser Rd Ste B Lake Zurich IL 60047 NO POSTAGE NECESSARY IF MAILED IN THE UNITED STATES POSTAGE WILL BE PAID BY ADDRES...

Отзывы: