27
2.11.5. Controls for The First Operation of The Boiler
In order for the Boiler not to be excluded from warranty coverage; its
first operation must definitely be done by the Warmhaus Authorized
Service. The following preliminary preparations must be made before
requesting an authorized service appointment:
- For your gas line, a gas approval certificate from the local gas
company must have been obtained,
- Electrical connection should have been made with a 2 or 3 Amp
fuse at the mounting site of the boiler,
- Make sure there is no power cut at the mounting site of the boiler,
- Make sure that there is no city water cut at the mounting site of the
boiler,
- Make sure that the heater is supplied with water and the pressure in
the boiler manometer is 1.2 - 1.5 bar.
2.12. REQUIRED INSTALLATION ELEMENTS FOR
BOILER AND HEATING SYSTEM OPERATION
To use the condensed boiler as a single unit or as a cascade, the following
installation elements must be definitely available in the heating installation;
• A hydraulic separator must be used for ideal heat and pressure distribution
of the boiler and installation. However, when the installation pressure is
higher than the maximum boiler pressure, when no oxygenbarrier pipe is
used on the installation side and in old installations where steel pipes are
used and have started to rust, the boiler/boilers must be separated from
the heating installations by using Plated Heat Exchanger in a way remaining
no direct connection.
• Air Separator
• Sludge/Sediment Holder
• Expansion Tank (If the system is separated by a plate exchanger, at least
one expansion tank must be placed in the return line of the cascade side
and the return line of the heating system side.)
• It is mandatory to have Filter (Strainers) elements in each boiler return
line.
These are essential accessories for your heating system to ensure efficient
operation and long life, and to keep your device in warranty. These
accessories are not supplied with the boiler.
BOILER PARAMETERS must be set according to the mounting options.
Cascade boilers
It should be noted that the installation parameters each boiler constituting
the heating system specified on the CASCADE INSTALLATION
PROCEDURE (when the boiler is used as cascade) must be changed in the
sequential/cascade installations using polypropylene waste gas collectors
with Chimney Block.
2.12.1. Boiler Parts
Figure 2.43
Boiler parts
1. Heater Return Line
2. Safety Valve Discharge Line (6 bar)
3. Chimney Over Temperature NTC Sensor
4. CH Return NTC Sensor
5. Automatic Air Discharge Purger (boiler return line)
6. Ignition and Ionization Electrode
7. Flame Surveillance Mirror
8. Ignition Transformer
9. Exhaust Gas Discharge Chimney (Ø100 mm)
10. Fresh Air Intake (Ø150 mm)
11. Air Intake Measuring Point
12. Chimney Gas Measurement Point
13. Automatic Air Discharge Purger (boiler stream line)
14. Air Suction Silencer
15. High Limit Thermostat
16. Main (Burning) Exchanger
17. Gas Valve
18. Main PCB Control Panel
19. Pressure sensor
20. Gaz Intake Pipe
21. Heater Stream Line
22. Condensation Siphon
1
2
3
5
7
6
12
8
21
20
18
17
15
14
11
1. CH Heating Return
2. Safety Valve Discharge (6bar)
3. Flue Over Heat NTC Sensor
4. CH Return NTC Sensor
5. Automatic Air Vent (inlet)
6. Ignition & İonisation Electrode
7. Flame İnspection mirror
8. İgnition Transformer
9. Exhaust (
∅
100mm Flue outlet)
10. Air Inlet (
∅
150mm)
11. Air İnlet Sample Point
12. Flue Gas Sample Point
13. Automatic Air Vent (outlet)
14. Air İntake Slincer
15. High Limit Thermostad
16. Main Heat Exchanger
17. Gas Valve
18. Main PCB Control Panel
19. Pressure Sensor
20. Gas Inlet Pipe
21. CH Heating Flow
22. Condensation Trap (Siphon)
4
9
10
19
22
13
16
Содержание VIWA 115
Страница 1: ...VIWA90 VIWA115 VIWA125 VIWA150 WALL MOUNTED CONDENSING BOILERS INSTALLATION AND USER MANUAL ...
Страница 2: ...Viwa 90 Viwa 115 Viwa 125 Viwa 150 ...
Страница 47: ...47 ...