3.11.5 Sign Off
The commissioning certificate must be signed by the commissioning engineer, with a copy sent
to Warmflow and a copy to remain with the appliance.
All product warranties will be invalidated if the appliance is not commissioned by a
Warmflow engineer or other trained and competent engineer and the combined
installation/commissioning certificate (See Section 0 of this manual) returned to Warmflow
within 30 days from the date of installation and 90 days from the date code stamped on the
appliance.
3.12 System Hand Over
After installation and commissioning has been completed, a handover package should be
completed by the installer and delivered to the house holder. This handover package will include
the following:
Instructions explaining the operation of the complete system (this user manual).
Final plans of the system layout to include; heating circuit design together with all
equipment and piping used.
Electrical Schematic of sensor and input/output connections outside of the heat pump unit.
The results of commissioning tests.
Contact details of the installer.
The installer should explain the components of the handover package to the householder.
3.13 Servicing
3.13.1
Servicing Schedule
The appliance must be serviced at least annually or as indicated by the user interface controller
(whichever occurs sooner) by a Warmflow Engineer or other competent Engineer. This is
necessary in order to optimise performance of the appliance and to ensure its efficiency and
safety for the user.
The below table is a typical list of service operations, however it is not exhaustive.
Item
Inspect
Clean
Test
Electrical Connections
Heating Circuit Filter
Inhibitor Concentration of Heating Solution
Glycol Concentration of Heating System*
Heating Circuit Pressure
Heating Manifold
Heating Pipework & Sealing
Heating Circuit Safety Devices
Heating Flow Rate
Insulation Inside Unit
Replace any defective components if necessary.
Содержание A Series
Страница 36: ...Page 34 Figure 24 AS02 R32 Casing Dimensions Heating Connection Locations FRONT SIDE TOP...
Страница 40: ...Page 38 Figure 26 Heating DHW Schematic Figure 27 Heating Only Schematic...
Страница 70: ...Page 68 7 APPENDIX B WIRING DIAGRAMS...
Страница 71: ...Page 69...
Страница 72: ...Page 70 This page is intentionally left blank...
Страница 74: ...Page 72 This page is intentionally left blank...
Страница 76: ...Page 74...
Страница 77: ...Page 75...
Страница 78: ...Page 76...
Страница 79: ...Page 77...
Страница 80: ...Page 78...
Страница 81: ...Page 79...
Страница 82: ...Page 80...
Страница 83: ...Page 81...
Страница 84: ...Page 82...
Страница 85: ...Page 83...
Страница 86: ...Page 84...
Страница 87: ...Page 85...
Страница 88: ...Page 86...