5.0 INSTALLATION AND FIXING
SILOTOP R03
2
FIL.100.--.M.EN Issue: A2
06.12
41
5.9 Inspection
*NQPSUBOU
When installation is complete, authorized personnel must carry out a general test to ensure that the
VDIHW\FRQGLWLRQVKDYHEHHQFRPSOHWHO\VDWLV¿HG
The authorized personnel must also check:
WKDWQRWRROVRURWKHUPDWHULDOKDYHEHHQIRUJRWWHQLQVLGHWKH¿OWHU
WKDWWKH¿[LQJVFUHZVKDYHEHHQWLJKWHQHGXVLQJWKHSUHVFULEHGWRUTXH
%HIRUHVWDUWLQJWRRSHUDWHWKH¿OWHU
(QVXUHWKDWWKHSODQWLQZKLFKWKH¿OWHULVLQVWDOOHGLVFRPSOLDQWWRWKH'LUHFWLYH(&DQGWRWKHUHO
-
HYDQWJHQHUDOGLUHFWLYHVDQGVDIHW\VWDQGDUGVLQIRUFHDQGWKRVHVSHFL¿FDOO\DSSOLFDEOH
- Ensure that the inspection hatches are locked with the bolts supplied inserted in their original position.
- Ensure that the operating conditions are met.
5.10 Commissioning
Preliminary checks
After completing the electrical and compressed air connections, carry out the following checks:
- Check to ensure the controller board is powered and set correctly.
(QVXUHWKDWWKHSUHVVXUHRIWKH¿OWHUUHVHUYRLULVEDU
- Check all nuts, bolts and locking devices to ensure they are perfectly tightened.
&KHFNDOOHOHPHQWVWRHQVXUHWKH\DUH¿[HGSURSHUO\WRWKHVHDOIUDPH
- Check the seals to ensure they are not damaged and the inspection hatch is closed.
- Ensure that the warning and instruction signs are present.
&KHFNSLSLQJFRQQHFWLRQVWRWKH¿OWHULIWKHVHDUHSUHVHQWWRHQVXUHWKH\DUHVHFXUHGDQGDVVHPEOHGFDUH
-
fully.