14
REMOVE?
The W600 series wiring is shown below for reference.
3.0 Operation
This section describes how to prepare the sensor for use.
Conditioning
The sensor requires conditioning to acclimate the electrodes prior to
generating stable readings. Conditioning consists of installing the sensor
in the flow cell, ensuring that the sensor remains wet at all times with
water containing the disinfectant to be measured, and supplying power
to the sensor.
The following conditioning times are recommended:
New Sensor
1 – 48 hours, depending upon water quality
New electrolyte
1 – 3 hours
Calibration
The frequency of calibration is a function of many factors. These factors
include:
1.
The accuracy required by the application.
2.
The value of the off-specification product versus the cost of
calibration.
Содержание WDS100
Страница 9: ...6 Typical Installation...
Страница 16: ...13 W900...