WAGO I/O System Compact
Commissioning 77
751-9301 Compact Controller 100
Manual
Version 1.1.0, valid from FW Version 03.08.07(20)
8
Commissioning
8.1
Switching On the Controller
Before switching on the controller ensure that you
•
have properly mounted the controller
(see section “Mounting”),
•
have connected all required data cables (see section “Connections”) to the
corresponding interfaces,
•
have connected the electronics and field-side power supply
(see section “Connections”),
•
have performed appropriate potential equalization at your machine/system
and
•
have performed shielding properly.
To switch on both the controller, switch on your power supply unit.
Starting of the controller is indicated by a brief flashing of the LEDs. After a few
seconds the SYS LED will indicate successful boot-up of the controller.
The runtime system
e!
RUNTIME
is started at the same time.
Once the entire system has been successfully started, the SYS LED lights up
green.
If there is an executable IEC 61131-3 program stored and running on the
controller, the RUN LED will light up green.
If no executable program is stored on the controller, or the mode selector switch
is set to STOP, this is likewise indicated by the RUN LED (see Section
“Diagnostics”).