42
Startup and Service
WAGO I/O SYSTEM 750 XTR
750-610/040-000 Power Supply 24 VDC Fuse Diagn XTR
Manual
Version 2.0.0
2.
Pivot cover down to open the fuse holder.
Figure 13: Opening the Fuse Holder
3.
Remove the old fuse (if any) and install the new fuse.
Figure 14: Replacing the Fuse
4.
Close the fuse holder.
5.
Push the fuse holder back into the I/O module housing.
The field supply to the downstream I/O modules is restored when pushing the
fuse holder back into place.