
28
B_04208
OPERATING MANUAL
VERSION 01/2013
ORDER NUMBER DOC 2335747
The grounding connection is mandatory with PM500 pumps.
Procedure:
1. Remove the crimp connection delivered with the pump.
2. Crimp the grounding cable on the terminal and screw it back onto the pump’s foot.
3. Ground the material/paint container to a local ground connection.
4. Ground the other parts of the system to a local ground connection.
Содержание PM500
Страница 2: ......
Страница 51: ......
Страница 52: ...Order No 2335747 People s Republic of China Phone Telefax Germany Phone Telefax E mail ...