
23
B_04204
OPERATING MANUAL
VERSION 01/2013
ORDER NUMBER DOC 2335747
6
ASSEMBLY AND COMMISSIONING
6.3
ASSEMBLY
6.2
STORAGE
Install the pump on a fl at and horizontal foundation and screw it on tightly.
Ensure that all fi xing screws (diaphragm covers, manifold, covers) are correctly tightened.
Tighten the fi xing screws regularly depending on pump use. In the case of continuous or
prolonged operation, it is advisable to check at least once a week that there are no air and/
or liquid leaks.
6.1
TRANSPORTATION
The pump may be moved manually, without lifts and cranes.
Store the pump in a closed and dry environment.
Thoroughly clean the pump, if a long-term decommissioning is planned.
When resuming pump operation, proceed as described in the following sections.
Discharge of electrostatically charged components in atmospheres
containing solvents!
Explosion hazard from electrostatic sparks.
Clean the pump only with a damp cloth.
WARNING
Inclined ground!
Risk of accidents if the device rolls away/falls.
Place the frame with the pump horizontally.
Secure frame.
WARNING
Содержание PM500
Страница 2: ......
Страница 51: ......
Страница 52: ...Order No 2335747 People s Republic of China Phone Telefax Germany Phone Telefax E mail ...