English
8. Close the HP quick connector and detach it from the air conditioning system.
Note
If you have turned off the vehicle engine to uncouple the HP quick connector, restart the en-
gine and turn on the air conditioning.
The following display messages appear:
service hoses!
Recovery from the
Wait!
STOP-EXIT
Process completed
9. To end the air conditioning test, press the
STOP
button.
13.8 Free Selection
The
Free selection
menu is used to perform air conditioning maintenance step-by-step. You can perform the
same processes as in the short selection menu, but also omit individual procedures. In addition, it is possible to
enter the values for each individual process using the keypad. You can also enter the vehicle data for the service
report in this menu.
The following four processes can be performed individually in the
Free selection
menu:
• Recycling phase: Extraction, recycling of the refrigerant, pressure rise test, draining the waste oil.
• Vacuum phase: Evacuating the system, leak test / vacuum check.
• Filling phase: Before working on the vehicle air conditioner, a leak inspection must be carried out. The air con-
ditioner is filled with a sample of refrigerant. The pressure in the air conditioner must remain constant over a
period of 5 min. The air conditioner can only be completely filled if this test has been successfully completed.
The sample filling is then drained and the air conditioner evacuated. The final filling quantity is completely filled
up to ensure high filling accuracy. Filling with fresh oil, filling of UV additive, filling of refrigerant.
• Selecting connections: The air conditioning system has a high pressure and low pressure connection, high
pressure or low pressure only connections.
After each process has been performed, a service report is printed.
1. Start by fitting the connections of the A/C service unit to the vehicle air conditioning system, and opening
them.
2. In the basic menu use the cursor keys or to select
Free selection
.
Short selection
Free selection
Other selections
ENTER-OK
3. Press
ENTER
to confirm.
4. Enter the vehicle data and press
ENTER
to confirm.
13.8.1 Recovery phase
1. Enter the preferred settings and press
ENTER
to confirm.
Rec/Recycling
Yes
phase?
No
ENTER-OK STOP-EXIT
23
Содержание AirCon Service 6300G
Страница 9: ...English 16 USB port 7...
Страница 42: ...English 17 1 Flowchart ASC6300 G Legend 40...
Страница 45: ...English 17 2 Flowchart ASC6400 G Legend 43...
Страница 48: ...English 17 3 Circuit diagram ASC6300 G 46...
Страница 49: ...English 47...
Страница 50: ...English 17 4 Circuit diagram ASC6400 G 48...
Страница 51: ...English 49...
Страница 93: ...French 17 1 Organigramme ASC6300 G L gende 91...
Страница 96: ...French 17 2 Organigramme ASC6400 G L gende 94...
Страница 99: ...French 17 3 Sch ma lectrique ASC6300 G 97...
Страница 100: ...French 98...
Страница 101: ...French 17 4 Sch ma lectrique ASC6400 G 99...
Страница 102: ...French 100...
Страница 143: ...German 17 1 Flussdiagramm ASC6300 G Legende 141...
Страница 146: ...German 17 2 Flussdiagramm ASC6400 G Legende 144...
Страница 149: ...German 17 3 Schaltplan ASC6300 G 147...
Страница 150: ...German 148...
Страница 151: ...German 17 4 Schaltplan ASC6400 G 149...
Страница 152: ...German 150...
Страница 154: ...4 4 Tel 49 0 2572 879 0 5 6 Domestic 152...
Страница 155: ...Russian 6 1 153...
Страница 156: ...Russian 6 2 R1234yf 405 C R134a 743 C R153A 6 3 154...
Страница 158: ...10 10 10 1 230 V 50 Hz 10 2 10 3 10 4 Short selection Free selection Other selections 156...
Страница 159: ...11 11 1 2 3 4 ECO 5 6 7 8 9 10 11 12 13 14 15 157...
Страница 160: ...Russian 16 USB 158...
Страница 185: ...Russian 2 D E 3 I 4 G 5 J 6 J 7 H G 8 9 10 Vacuum time 178 183...
Страница 193: ...Russian 17 1 ASC6300 G 191...
Страница 195: ...Russian X23 DO X3 UV X4 X5 Z2 X6 Z2 X7 HP X8 HP X9 RE 193...
Страница 196: ...Russian 17 2 ASC6400 G 194...
Страница 198: ...Russian X10 VC X16 CY X2 LP X23 DO X3 UV X4 X5 Z2 X6 Z2 X7 HP X8 HP X9 RE 196...
Страница 199: ...Russian 17 3 ASC6300 G 197...
Страница 200: ...Russian 198...
Страница 201: ...Russian 17 4 ASC6400 G 199...
Страница 202: ...Russian 200...
Страница 244: ...Spanish 17 1 Diagrama de flujo ASC6300 G Leyenda 242...
Страница 247: ...Spanish 17 2 Diagrama de flujo ASC6400 G Leyenda 245...
Страница 250: ...Spanish 17 3 Esquema de conexiones ASC6300 G 248...
Страница 251: ...Spanish 249...
Страница 252: ...Spanish 17 4 Esquema de conexiones ASC6400 G 250...
Страница 253: ...Spanish 251...
Страница 254: ...4445103554 2022 05 02...