Lifting the Machine
LTN 6L
30
wc_tx001375gb.fm
3
Lifting the Machine
3.1
Procedure
See Graphic: wc_gr005415
3.1.1
Check that the tower cradle lock pin
(a)
is in place and secured with
the safety pin.
3.1.2
Ensure that the tower is completely nested inside the transport cradle
and the pin
(b)
is secure.
3.1.3
Make sure the doors are properly latched.
3.1.4
Return the outriggers to their travel position. Check that the outrigger
bars and jacks are locked in place.
3.1.5
Crank the rear jack
(c)
all the way in and rotate it 90°.
The Light Tower is now ready to lift.
wc_gr005415
a
c
b
Содержание LTN 6L
Страница 1: ...0171883en 007 1110 0 1 7 1 8 8 3 E N Operator s Manual Light Tower LTN 6L 60 Hz ...
Страница 17: ...LTN 6L Labels wc_si000381gb fm 17 wc_gr007037 R S U V L H F B N J M D Y FF AA AA DD BB GG EE CC BB HH JJ ...
Страница 37: ...LTN 6L Operation wc_tx000766gb fm 37 o ...
Страница 69: ...LTN Appendix I Assembly Instructions wc_tx001218gb fm 69 Illustrations D wc_gr006517 ...
Страница 117: ......